Calculating the Fuzzy Project Network Critical Path

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Calculating the Project Network Critical Path in Uncertainty Conditions

Correct scheduling of the project is the necessary condition for the project success. In traditional models, the activities duration times are deterministic and known. In real world however, accurate calculation of time for performing each activity is not possible and is always faced with uncertainty. In this paper, the duration of each activity is estimated by the experts as linguistic variabl...

متن کامل

Fuzzy Critical Path Problem for Project Network

The task of finding the crisp critical path has received researcher’s attention over the past two decades which has wide range of applications in planning and scheduling the large projects. In most cases of our life, the data obtained for decision makers are only approximate, which gives rise to fuzzy critical path problem. In this paper, new ranking methods are introduced to identify the fuzzy...

متن کامل

Secondary Critical Path in a Fuzzy Project Network

In a fuzzy project network, the higher risk path is called possible critical path. Secondary critical path is one of the possible critical path in fuzzy project network and it plays an important role in the project scheduling, risk analysis and time-cost trade-off problems in fuzzy environment. In this paper, triangular fuzzy numbers are used to express the operation times for all activities in...

متن کامل

Critical path analysis in the network with fuzzy activity times

A natural generalization of the criticality notion in a network with fuzzy activity times is given. It consists in direct application of the extension principle of Zadeh to the notion of criticality of a path (an activity, an event) treated as a function of the activities duration times in the network. There are shown some relations between the notion of fuzzy criticality, introduced in the pap...

متن کامل

A New Approach to find Total Float time and Critical Path in a fuzzy Project Network

The purpose of the critical path method (CPM) is to identify the critical activities in the critical path of an activity network. In the real world for many projects we have to use human judgment for estimating the duration of activities. However, the unknowns or vagueness about the time duration for activities in network planning, has led to the development of fuzzy CPM. A way to deal with thi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Engineering & Technology

سال: 2012

ISSN: 2227-524X

DOI: 10.14419/ijet.v1i2.43