Cable Force Calculation of Cable Hoisting of CFST Arch Bridge Research
نویسندگان
چکیده
To effectively control the stress state and spatial alignment of arch ribs in cable hoisting construction a long-span, concrete-filled, steel tube bridge ensure safety structure, it is necessary to calculate determine appropriate force. Based on actual project double-span, tubular bridge, stage left span from beginning closure taken as an example. The linear method “quiet do not move” adopted. principle that vertical displacement front end installed segment caused by self-weight new equal previous tension segment, force calculated forward iteration. Finally, based theory stress-free method, ideal design structure was achieved. results show after error range −13.33–15.40% bank −8.37–11.00% right bank. elevation rib −0.003–0.043 m −0.007–0.032 overall ±7.0 MPa. between theoretical value within scope specification requirements, which meets requirements. After closure, shape smooth
منابع مشابه
Asymptotic Analysis of a Translating Cable Arch
The stability of a translating cable which stands in the shape of an arch between two supports is investigated. Asymptotic solutions for free in-plane and out-of-plane cable vibrations are derived under the assumption of small arch height. Without translation speed, the cable arch collapses under compressional loading. As translation speed is increased, however, the cable arch becomes tensioned...
متن کاملInternal Force State Recognition of Jiujiang Bridge Based on Cable Force-displacement Relationship
The nearly 21-year-old Jiujiang Bridge, which is suffering from uneven line shape, constant great downwarping of the main beam and cracking of the box girder, needs reinforcement and cable adjustment. It has undergone cable adjustment for twice with incomplete data. Therefore, the initial internal force state of the Jiujiang Bridge is identified as the key for the cable adjustment project. Base...
متن کاملHealth Condition Evaluation of Cable-Stayed Bridge Driven by Dissimilarity Measures of Grouped Cable Forces
An index system for the health-status evaluation of cable-stayed bridges is presented based on a set of dissimilarity measures (abbr. DM) of the cable force of grouped cables. The DMs and its corresponding health status labels derived by the serviceability limit states of a bridge are determined by the combination of the finite element method and the influence matrix method. The Monte-Carlo met...
متن کاملAssessment of the Current State of Internal Force and the Optimization of Cable Force for an Existing Long-span Pre-Stressed Concrete (PC) Cable-stayed Bridge
Due to the influence of load, fatigue, corrosion, natural material aging and other long-term adverse factors, the state of the internal force of a cable-stayed bridge will be changed. These long-term effects can result in the bridge not meeting specified functional requirements, and potentially resulting in structural failure. This investigation focuses on the parameter identification of a gird...
متن کاملCable optimization of a long span cable stayed bridge in La Coruña (Spain)
This document describes an optimization problem of cable cross section of a cable stayed bridge considering constraints of cable stress and deck displacement. Since the bridge is still in study phase, the geometry and the mechanical characteristics are subjected to changes. In order to avoid creating different structural models, a program was produced to construct a model from geometrical and m...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Buildings
سال: 2023
ISSN: ['2075-5309']
DOI: https://doi.org/10.3390/buildings13092370