Burstable resource compatible general resource scheduling for stochastic demands in heterogeneous cloudsU+2605;
نویسندگان
چکیده
منابع مشابه
Resource Allocation Under Stochastic Demands
Military theater settings may involve many competing missions whose whose requirements tax the coalition’s resources in multiple dimensions—i.e., requiring different amounts of many different kinds of resources, e.g., fuel, bandwidth, personnel, etc., each of which is available in limited supply— and in uncertain or stochastic amounts. To serve the overall mission, we need to satisfy resource r...
متن کاملSplittable stochastic project scheduling with constrained renewable resource
This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...
متن کاملStochastic Resource-constrained Project Scheduling
PREFACE After having received my diploma from the Technische Universität Berlin in 1996, Rolf Möhring, the supervisor of my diploma thesis, offered me a research position in his group. At that time I was employed at a Berlin software company the head of which, Gert Scheschonk, strongly encouraged me to accept the offer. I accepted and in 1997 I began to work within a research initiative funded ...
متن کاملsplittable stochastic project scheduling with constrained renewable resource
this paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. if the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. it is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. the ...
متن کاملA THEORETICALLY CORRECT RESOURCE USAGE VISUALIZATION FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
The cumulative resource constraints of the resource-constrained project scheduling problem (RCPSP) do not treat the resource demands as geometric rectangles, that is, activities are not necessarily assigned to the same resource units over their processing times. In spite of this fact, most papers on resource-constrained project scheduling mainly in the motivation phase use a strip packing of re...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Ain Shams Engineering Journal
سال: 2021
ISSN: 2090-4479
DOI: 10.1016/j.asej.2021.05.017