BUMPER DEBRIS CLOUD STRUCTURE ESTIMATED BY SHOCK CALCULATIONS

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Ligand Affinities Estimated by Quantum Chemical Calculations.

We present quantum chemical estimates of ligand-binding affinities performed, for the first time, at a level of theory for which there is a hope that dispersion and polarization effects are properly accounted for (MP2/cc-pVTZ) and at the same time effects of solvation, entropy, and sampling are included. We have studied the binding of seven biotin analogues to the avidin tetramer. The calculati...

متن کامل

Cloud filling and error calculations

DINEOF reconstruction of clouded images including error maps. Application to the Sea-Surface Temperature around Corsican Island J.-M. Beckers, A. Barth, and A. Alvera-Azcárate GeoHydrodynamics and Environment Research, MARE, University of Liège, Sart-Tilman B5, 4000 Liège, Belgium College of Marine Science, University of South Florida, 140 7th Avenue South, St. Petersburg, Florida 33701, USA Ho...

متن کامل

Vertical structure of debris discs

Context. The vertical thickness of debris discs is often used as a measure of these systems’ dynamical excitation, and as clues to the presence of hidden massive perturbers such as planetary embryos. However, this argument might be flawed because the observed dust should be naturally placed on inclined orbits by the combined effect of radiation pressure and mutual collisions. Aims. We criticall...

متن کامل

Size and Shape of TBM Debris Estimated by the Nishimatsu's Cutting- Resistance Equation

Information concerning the size and shape of tunnel boring machine (TBM) debris is essential for designing efficient loading, hauling and dumping systems for TBM excavation. It is also very important in deciding how to recycle the TBM debris. However, only very limited information is available at present, and theoretical or calculation methods to estimate the size and shape are still open to di...

متن کامل

Buried Bumper Syndrome complicated by intra-abdominal sepsis.

There is growing evidence that enteral feeding tubes are associated with increased mortality and complication rates in patients with advanced dementia. Buried Bumper Syndrome is an uncommon, but well documented late complication of PEG placement. Our case report reinforces this recognised risk of PEG feeding in an elderly, cognitively impaired patient.

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Le Journal de Physique IV

سال: 1991

ISSN: 1155-4339

DOI: 10.1051/jp4:19913127