BUILDING PREDICTIVE ELECTRICITY CONSUMPTION MODELS FOR TRADITIONAL AND SMART GRID POWER SUPPLY SCHEMES FOR IRON ORE MINES

نویسندگان

چکیده

The paper studies the peculiarities of building predictive models electricity consumption according to traditional and considered schemes built on concept Smart Grid, as well rapidity changes in mode consumption, chaotic – avalanche-like forms a corresponding series problematic issues. Need be solved today: first all systematization volumes at iron ore mine. This problem is relevant not only terms reducing irregularity amount consumed by mine, but also will increase efficiency energy which turn volume products (iron raw materials). Predictability carried out isolating these relationships between variables statistical mathematical method multiple correlation, predicted model influenced large number factors. basis for construction power supply their subsequent transformation are “smart technologies” industry development. introduction including Grid allow stabilize predict schedules contrast its supply. purpose this work investigate issues developed contributing production materials) reduce cost compete quality price. with foreign producers materials Ukrainian mines

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Trading agents for the smart electricity grid

The vision of the Smart Grid includes the creation of intelligent electricity supply networks to allow efficient use of energy resources, reduce carbon emissions and are robust to failures. One of the key assumptions underlying this vision is that it will be possible to manage the trading of electricity between homes and micro-grids while coping with the inherent real-time dynamism in electrici...

متن کامل

Scheduling for Electricity Cost in Smart Grid

We study an offline scheduling problem arising in demand response management in smart grid. Consumers send in power requests with a flexible set of timeslots during which their requests can be served. For example, a consumer may request the dishwasher to operate for one hour during the periods 8am to 11am or 2pm to 4pm. The grid controller, upon receiving power requests, schedules each request ...

متن کامل

Hosting Capacity of the Power Grid for Renewable Electricity Production and New Large Consumption Equipment

After a brief historical introduction to the hosting-capacity approach, the hosting capacity is presented in this paper as a tool for distribution-system planning under uncertainty. This tool is illustrated by evaluating the readiness of two low-voltage networks for increasing amounts of customers with PV panels or with EV chargers. Both undervoltage and overvoltage are considered in the studie...

متن کامل

a new approach to credibility premium for zero-inflated poisson models for panel data

هدف اصلی از این تحقیق به دست آوردن و مقایسه حق بیمه باورمندی در مدل های شمارشی گزارش نشده برای داده های طولی می باشد. در این تحقیق حق بیمه های پبش گویی بر اساس توابع ضرر مربع خطا و نمایی محاسبه شده و با هم مقایسه می شود. تمایل به گرفتن پاداش و جایزه یکی از دلایل مهم برای گزارش ندادن تصادفات می باشد و افراد برای استفاده از تخفیف اغلب از گزارش تصادفات با هزینه پائین خودداری می کنند، در این تحقیق ...

15 صفحه اول

Grey Prediction Model for Forecasting Electricity consumption

Accurate prediction of the future electricity consumption is crucial for production electricity management. Since the storage of electrical energy is very difficult, reliable and accurate prediction of power consumption is important. Different approaches for this purpose were used. In this paper, Grey model (1,1) based on grey system theory has been used for forecasting results. Annual electric...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Vìsnik Hmel?nic?kogo nacìonal?nogo unìversitetu

سال: 2023

ISSN: ['2307-5732']

DOI: https://doi.org/10.31891/2307-5732-2023-317-1-48-57