Building Information Modelling for Whole-Building LCA: BIM4LCA

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

OPTIMALIZATION PHASE USING GRAPH MODELLING FOR RELIABLE BUILDING COMPLEXES

During the planning phase of modern, complex, block-structured, large-area located, but still landscape-harmonized health-care buildings, the key is the optimal positioning of the blocks and functions, simultaneously ensuring the most-effective backup-paths for any transportation route failure in the buildings in order to speed up system operation, reduce maintenance costs and especially to imp...

متن کامل

Common Exercises in Whole Building Ham Modelling

Subtask 1 of the IEA ECBCS Annex 41 (IEA 2007) project had the purpose to advance development in modelling of integral Heat, Air and Moisture (HAM) transfer processes that take place in “whole buildings”. Such modelling considers all relevant elements of buildings: The indoor air, building envelope, inside constructions, furnishing, systems and users. The building elements interact with each ot...

متن کامل

Building Information Modelling for Smart Built Environments

Building information modelling (BIM) provides architectural 3D visualization and a standardized way to share and exchange building information. Recently, there has been an increasing interest in using BIM, not only for design and construction, but also the post-construction management of the built facility. With the emergence of smart built environment (SBE) technology, which embeds most spaces...

متن کامل

Lidar-equipped Uav for Building Information Modelling

The trend to minimize electronic devices in the last decades accounts for Unmanned Airborne Vehicles (UAVs) as well as for sensor technologies and imaging devices, resulting in a strong revolution in the surveying and mapping industries. However, only within the last few years the LIDAR sensor technology has achieved sufficiently reduction in terms of size and weight to be considered for UAV pl...

متن کامل

Towards Building Information Modelling for Existing Structures

Capturing and modelling 3D information of the built environment is very challenging. A number of techniques and technologies are now in use such as EDM, GPS, photogrammetric applications, and building surveying applications. However, use of these technologies has not been practical and efficient with regard to time, cost and accuracy. A multi-disciplinary knowledge base, created from studies an...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP Conference Series: Earth and Environmental Science

سال: 2019

ISSN: 1755-1315

DOI: 10.1088/1755-1315/290/1/012044