Biological Nutrient Removal Model No. 2 (BNRM2): a general model for wastewater treatment plants

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Biological Nutrient Removal Model No. 2 (BNRM2): a general model for wastewater treatment plants.

This paper presents the plant-wide model Biological Nutrient Removal Model No. 2 (BNRM2). Since nitrite was not considered in the BNRM1, and this previous model also failed to accurately simulate the anaerobic digestion because precipitation processes were not considered, an extension of BNRM1 has been developed. This extension comprises all the components and processes required to simulate nit...

متن کامل

Life Cycle Assessment of Biological Nutrient Removal Wastewater Treatment Plants

Advances in wastewater treatment over the past 150 years have improved public health and local water quality. Recently however, society has begun to consider the wider environmental implications of these improvements. This paper uses life cycle assessment to quantitatively compare the environmental costs and benefits of different wastewater treatment technologies and standards. It is demonstrat...

متن کامل

Benchmarking biological nutrient removal in wastewater treatment plants: influence of mathematical model assumptions.

This paper examines the effect of different model assumptions when describing biological nutrient removal (BNR) by the activated sludge models (ASM) 1, 2d & 3. The performance of a nitrogen removal (WWTP1) and a combined nitrogen and phosphorus removal (WWTP2) benchmark wastewater treatment plant was compared for a series of model assumptions. Three different model approaches describing BNR are...

متن کامل

Fate of organic nitrogen in four biological nutrient removal wastewater treatment plants.

This study investigated the fate of nitrogen species, especially organic nitrogen, along the mainstream wastewater treatment processes in four biological nutrient removal (BNR) wastewater treatment plants (WWTPs). It was found that the dissolved organic nitrogen (DON) fraction was as high as 47% of soluble nitrogen (SN) in the low-SN effluent plant, which limited the plant's capability to remov...

متن کامل

Chebyshev finite difference method for solving a mathematical model arising in wastewater treatment plants

The Chebyshev finite difference method is applied to solve a system of two coupled nonlinear Lane-Emden differential equations arising in mathematical modelling of the excess sludge production from wastewater treatment plants. This method is based on a combination of the useful properties of Chebyshev polynomials approximation and finite difference method. The approach consists of reducing the ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Water Science and Technology

سال: 2013

ISSN: 0273-1223,1996-9732

DOI: 10.2166/wst.2013.004