Bilevel Neighborhood Search Hybrid Algorithm for the Flexible Job Shop Scheduling Problem

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Flexible job-shop scheduling with parallel variable neighborhood search algorithm

Flexible job-shop scheduling problem (FJSP) is an extension of the classical job-shop scheduling problem. FJSP is NP-hard and mainly presents two difficulties. The first one is to assign each operation to a machine out of a set of capable machines, and the second one deals with sequencing the assigned operations on the machines. This paper proposes a parallel variable neighborhood search (PVNS)...

متن کامل

An Improved Tabu Search Algorithm for Job Shop Scheduling Problem Trough Hybrid Solution Representations

Job shop scheduling problem (JSP) is an attractive field for researchers and production managers since it is a famous problem in many industries and a complex problem for researchers. Due to NP-hardness property of this problem, many meta-heuristics are developed to solve it. Solution representation (solution seed) is an important element for any meta-heuristic algorithm. Therefore, many resear...

متن کامل

solving flexible job-shop scheduling problem using hybrid algorithm based on gravitational search algorithm and particle swarm optimization

job shop scheduling problem has significant importance in many researchingfields such as production management and programming and also combinedoptimizing. job shop scheduling problem includes two sub-problems: machineassignment and sequence operation performing. in this paper combination ofparticle swarm optimization algorithm (pso) and gravitational search algorithm(gsa) have been presented f...

متن کامل

Discrepancy search for the flexible job shop scheduling problem

The Flexible Job Shop scheduling Problem (FJSP) is a generalization of the classical Job Shop Problem in which each operation must be processed on a given machine chosen among a finite subset of candidate machines. The aim is to find an allocation for each operation and to define the sequence of operations on each machine so that the resulting schedule has a minimal completion time. We propose ...

متن کامل

Iterative Flattening Search for the Flexible Job Shop Scheduling Problem

This paper presents a meta-heuristic algorithm for solving the Flexible Job Shop Scheduling Problem (FJSSP). This strategy, known as Iterative Flattening Search (IFS), iteratively applies a relaxationstep, in which a subset of scheduling decisions are randomly retracted from the current solution; and a solving-step, in which a new solution is incrementally recomputed from this partial schedule....

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Mechanical Engineering

سال: 2015

ISSN: 0577-6686

DOI: 10.3901/jme.2015.14.175