Bi-criteria parallel batch machine scheduling to minimize total weighted tardiness and electricity cost

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Novel B and B Algorithm for a Unrelated Parallel Machine Scheduling Problem to Minimize the Total Weighted Tardiness

This paper presents a scheduling problem with unrelated parallel machines and sequencedependent setup times that minimizes the total weighted tardiness. A new branch-and-bound (B and B) algorithm is designed incorporating the lower and upper bounding schemes and several dominance properties. The lower and upper bounds are derived through an assignment problem and the composite dispatching rule ...

متن کامل

Parallel-machine scheduling to minimize tardiness penalty and power cost

0360-8352/$ see front matter 2012 Elsevier Ltd. A http://dx.doi.org/10.1016/j.cie.2012.10.002 q This manuscript was processed by Area Editor T.C ⇑ Corresponding author. Tel.: +886 3 5131472; fax: E-mail addresses: [email protected] (K.-T. Fan (B.M.T. Lin). Traditional research on machine scheduling focuses on job allocation and sequencing to optimize certain objective functions that are defin...

متن کامل

Single Machine and Parallel Machine Scheduling Problems with a Common Due Date to Minimize Total Weighted Tardiness

This paper deals with a common due date parallel machines scheduling problem in which each job has a different tardiness penalty. The objective is to minimize the total weighted tardiness. The scheduling problem of minimizing the total weighted tardiness with a common due date on a single machine is known to be ordinary NP-hard. This is also the case for problem Pm|di = d| ∑ wiTi. A new dynamic...

متن کامل

Single Machine Group Scheduling with Setups to Minimize Total Tardiness

This paper considers the single machine scheduling problem with independent family (group) setup times where jobs in each family are processed together. A sequence independent setup is required to process a job from a different family. The objective is to minimize total tardiness. A mixed integer programming model capable of solving small sized problems is described. Several heuristic algorithm...

متن کامل

Scheduling on parallel identical machines to minimize total tardiness

This paper focuses on the problem of scheduling n independent jobs on m identical parallel machines for the objective of minimizing total tardiness of the jobs. We develop dominance properties and lower bounds, and develop a branch and bound algorithm using these properties and lower bounds as well as upper bounds obtained from a heuristic algorithm. Computational experiments are performed on r...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Business Economics

سال: 2020

ISSN: 0044-2372,1861-8928

DOI: 10.1007/s11573-020-00970-6