Bi-criteria Assembly Line Worker Assignment and Balancing Problem by Considering Labor Cost
نویسندگان
چکیده
Assignment of worker appears as a new problem in the literature for assembly lines (AL) where workforce is heterogeneously located. The difference this line balancing from traditional that task times workers to be assigned stations differ each other. Especially such assignment and balancing, are generally labor-intensive type production. Therefore, while kind lines, it should done considering labor costs. Thus, proposed solutions will able produce more realistic results real life environments. For purpose, study, mixed integer mathematical formulation presented ALWABP by objective function minimizing costs cycle time. efficiency model improvements has been demonstrated solving test instances literature.
منابع مشابه
An algorithm for integrated worker assignment, mixed-model two-sided assembly line balancing and bottleneck analysis
This paper addresses a multi-objective mixed-model two-sided assembly line balancing and worker assignment with bottleneck analysis when the task times are dependent on the worker’s skill. This problem is known as NP-hard class, thus, a hybrid cyclic-hierarchical algorithm is presented for solving it. The algorithm is based on Particle Swarm Optimization (PSO) and Theory of Constraints (TOC) an...
متن کاملSimultaneous Multi-Skilled Worker Assignment and Mixed-Model Two-Sided Assembly Line Balancing
This paper addresses a multi-objective mathematical model for the mixed-model two-sided assembly line balancing and worker assignment with different skills. In this problem, the operation time of each task is dependent on the skill of the worker. The following objective functions are considered in the mathematical model: (1) minimizing the number of mated-stations (2), minimizing the number of ...
متن کاملAn Analytical Approach for Single and Mixed-Model Assembly Line Rebalancing and Worker Assignment Problem
In this paper, an analytical approach is used for assembly line rebalancing and worker assignment for single and mixed-model assembly lines based on a heuristic-simulation algorithm. This approach helps to managers to select a better marketing strategy when different combinations of demands are suitable.Furthermore, they can use it as a guideline to know which worker assignment is better for ea...
متن کاملAssembly Line Worker Integration and Balancing Problem
We propose the Assembly Line Worker Integration and Balancing Problem (ALWIBP), a new assembly line balancing problem arising in lines with conventional and disabled workers. The goal of this problem is to maintain high productivity levels by minimizing the number of workstations needed to reach a given output, while including in the assembly line a number of disabled workers. This problem gain...
متن کاملA Bi-Objective Approach to an Assembly Line Re-Balancing Problem: Model and Differential Evolution Algorithms
Assembly lines are special kinds of production systems which are of great importance in the industrial production of high quantity commodities. In many practical manufacturing systems, configuration of assembly lines is fixed and designing a new line may be incurred huge amount of costs and thereby it is not desirable for practitioners. When some changes related to market demand occur, it is wo...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of innovative science and engineering
سال: 2021
ISSN: ['2602-4217']
DOI: https://doi.org/10.38088/jise.902395