BEHAVIOR OF PRIMARY TUNNEL LINING IN HIGHLY TIME DEPENDENT SOFT ROCK

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Calculation of tunnel behavior in viscoelastic rock mass

Wall displacements and ground pressure acting on the lining of a tunnel increase with time. These time-dependent deformations are both due to face advance effect and to the time-dependent behavior of the rock mass.  Viscoelastic materials exhibit both viscous and elastic behaviors. Thorough this study, the effect of different linear viscoelastic models including Maxwell, Kelvin and Kelvin-Voigt...

متن کامل

Effects of the Soft Rock Pre-consolidation on Time-dependent Deformations around the Tunnel Excavation

Original scientific paper Time-dependent deformations in soft rocks represent an important part of total deformations which occur after excavation of the tunnel opening. In the light of this, comprehensive laboratory uniaxial creep tests were performed on marl rock monolits. The testing used marl as a chosen representative rock samples of the group of soft rocks which exhibits creep behaviour. ...

متن کامل

calculation of tunnel behavior in viscoelastic rock mass

wall displacements and ground pressure acting on the lining of a tunnel increase with time. these time-dependent deformations are both due to face advance effect and to the time-dependent behavior of the rock mass.  viscoelastic materials exhibit both viscous and elastic behaviors. thorough this study, the effect of different linear viscoelastic models including maxwell, kelvin and kelvin-voigt...

متن کامل

Time-Dependent Damage Investigation of Rock Mass in an In Situ Experimental Tunnel

In underground tunnels or caverns, time-dependent deformation or failure of rock mass, such as extending cracks, gradual rock falls, etc., are a costly irritant and a major safety concern if the time-dependent damage of surrounding rock is serious. To understand the damage evolution of rock mass in underground engineering, an in situ experimental testing was carried out in a large belowground t...

متن کامل

Engineering geological studies used for redesigning and employing a hard rock TBM in soft rock formations of Chamshir water conveyance tunnel

The Chamshir water conveyance tunnel (CWCT) with a length of 7.4 km and boring diameter of 5.3 m is excavated using a refurbished single shield TBM, initially designed to work in hard rock formations. This study focuses on engineering geological issues, which are important for checking the suitability of this machine and proposing required modifications for improving its performance in soft roc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Doboku Gakkai Ronbunshu

سال: 1989

ISSN: 0289-7806,1882-7187

DOI: 10.2208/jscej.1989.412_153