Beam commissioning and operation of the J-PARC linac

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Operating Experience of the J-PARC Linac

The beam commissioning of the J-PARC linac started in November 2006 and 181 MeV acceleration was successfully achieved in January 2007. The linac has delivered beams to the 3 GeV Rapid Cycling Synchrotron for its commissioning, and then, the subsequent Main Ring Synchrotron and the neutron target commissioning. The linac uses a Cs-free LaB6-driven ion source and 20 units of 324 MHz klystrons. A...

متن کامل

Power Upgrade of J-parc Linac

The linac power upgrade program is now in progress, after a successful recovery from the earthquake disaster. The power upgrade includes an ion source, a RFQ, and a 400 MeV annular-ring coupled structure (ACS) linac. We started a full-scale development of a cesium-seeded RFdriven negative hydrogen ion source. The ion source extracted a beam current of more than 60 mA with a duty factor of 2.5 %...

متن کامل

Performance of the Main Ring Bpm during the Beam Commissioning at J-parc

Experiences of operating BPM's during beam commissioning at the J-PARC MR are reported. The subjects are: (1) bug report, statistics and especially the effect of a beam duct step, (2) position resolution estimation, (3) test of beam based alignment.

متن کامل

Commissioning of the Lcls Linac∗

The Linac Coherent Light Source (LCLS) X-ray free electron laser project is currently under construction at the Stanford Linear Accelerator Center (SLAC). A new injector and upgrades to the existing accelerator were installed in two phases in 2006 and 2007. We report on the commissioning of the injector, the two new bunch compressors at 250 MeV and 4.3 GeV, and transverse and longitudinal beam ...

متن کامل

Operation of the Linac and the Linac Rf System for the Ion-beam Therapy Center Heidelberg

The Heidelberg Ion Therapy Center HIT is in clinical operation since 2009. It is the first dedicated European particle accelerator for medical treatment. Its central location on the campus of the Heidelberg University Hospital fits perfectly in the clinical everyday life. The accelerator complex consists of a linear accelerator and a synchrotron and is designed for protons and carbon ions, but ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Progress of Theoretical and Experimental Physics

سال: 2012

ISSN: 2050-3911

DOI: 10.1093/ptep/pts019