Batch Scheduling in Flexible Flow Shop
In this paper, the problem of batch scheduling in a flexible flow shop environment is studied. It is assumed that machines in some stages are able to process a number of jobs simultaneously. The applications of this problem can be found in various industries including spring and wire manufacturing and in auto industry. A mixed integer programming formulation of the problem is presented and it i...
متن کاملBatch Scheduling in Flexible Flow Shop
In this paper, the problem of batch scheduling in a flexible flow shop environment is studied. It is assumed that machines in some stages are able to process a number of jobs simultaneously. The applications of this problem can be found in various industries including spring and wire manufacturing and in auto industry. A mixed integer programming formulation of the problem is presented and it i...
متن کاملA Two-stage Flow Shop Scheduling with a Critical Machine and Batch Availability
We study a two-stage flowshop, where each job is processed on the first (critical) machine, and then continues to one of two second-stage (dedicated) machines. We assume identical (but machine-dependent) job processing times. Jobs are processed on the critical machine in batches, and a setup time is required when starting a new batch. The setting assumes batch-availability, i.e., jobs become av...
متن کاملBi-objective Optimization for Just in Time Scheduling: Application to the Two-Stage Assembly Flow Shop Problem
This paper considers a two-stage assembly flow shop problem (TAFSP) where m machines are in the first stage and an assembly machine is in the second stage. The objective is to minimize a weighted sum of earliness and tardiness time for n available jobs. JIT seeks to identify and eliminate waste components including over production, waiting time, transportation, inventory, movement and defective...
متن کاملA three-stage assembly flow shop scheduling problem with blocking and sequence-dependent set up times
This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup < /div> times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditiona...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Foundations of Computing and Decision Sciences
سال: 2014
ISSN: 0867-6356
DOI: 10.2478/fcds-2014-0001