Abstract To conduct baseline load forecasting for commercial building users participating in demand response, this paper proposes a response method that takes meteorological factors into account. Using the principal component analysis, indicators contributing more than 80% to are selected as reference data neural network load. The isolated forest algorithm and KNN used identify abnormal fill missing data, with different attributes partially “decoupled.” two parts of decoupled separately forecasting, total is obtained after merging. From these results, it obvious proposed can effectively improve accuracy algorithm.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value

Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...

متن کامل

Forecasting Natural Gas Demand Using Meteorological Data: Neural Network Method

The need for prediction and patterns of gas consumption especially in the cold seasons is essential for consumption management and policy planning decision making. In residential and commercial uses which account for the bulk of gas consumption in the country the effects of meteorological variables have the highest impact on consumption.  In the present research four variables include daily ave...

متن کامل

A New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value

Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...

متن کامل

Fisher Information Based Meteorological Factors Introduction and Features Selection for Short-Term Load Forecasting

Weather information is an important factor in short-term load forecasting (STLF). However, for a long time, more importance has always been attached to forecasting models instead of other processes such as the introduction of weather factors or feature selection for STLF. The main aim of this paper is to develop a novel methodology based on Fisher information for meteorological variables introd...

متن کامل

Taking Handicap into Account: Systemic Features

Because of many features of handicap, such as the number of actors and interactions, the complexity of the field, handicap must be considered from a system point of view, and dealt with as any system. That makes it possible to build a comprehensive response to the question of the inclusion and full citizenship of people with disabilities, better than some fragmentary solutions often proposed. T...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of physics

سال: 2023

ISSN: ['0022-3700', '1747-3721', '0368-3508', '1747-3713']

DOI: https://doi.org/10.1088/1742-6596/2527/1/012025