Balancing and scheduling tasks in assembly lines with sequence-dependent setup times
نویسندگان
چکیده
منابع مشابه
Balancing and scheduling tasks in assembly lines with sequence-dependent setup times
The classical Simple Assembly Line Balancing Problem (SALBP) has been widely enriched over the past few years with many realistic approaches and much effort has been made to reduce the distance between the academic theory and the industrial reality. Despite this effort, the scheduling of the execution of tasks assigned to every workstation following the balancing of the assembly line has been s...
متن کاملSimultaneous Balancing and Scheduling of Flexible Mixed Model Assembly Lines with Sequence-Dependent Setup Times
We consider Simultaneous Balancing and Scheduling of Flexible Mixed Model Assembly Lines with Sequence-Dependent Setup Times (SBSFMMAL-SDST). We propose alternate Mixed Integer Programming (MIP) and Constraint Programming (CP) formulations. Our experiments show that while the MIP models could not solve relatively small instances, the CP approach seems more promising.
متن کاملan assembly flow-shop scheduling problem with sequence-dependent setup and transportation times
in this paper, three-stage assembly flowshop scheduling is considered with respect to minimizing bi-objectives, namely mean flow time and mean tardiness. this problem is a model of production systems, which several production operations are done simultaneously and independently, and then produced components are collected and transferred to an assembly stage for the final operation. in this mode...
متن کاملA bi-objective model for the assembly flow shop scheduling problem with sequence dependent setup times and considering energy consumption
متن کامل
Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints
This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: European Journal of Operational Research
سال: 2008
ISSN: 0377-2217
DOI: 10.1016/j.ejor.2006.07.044