Availability and Maintenance Modeling for GIS Equipment Served in High-Speed Railway Under Incomplete Maintenance

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

High-Speed Railway Traction Power Supply Equipment Condition-Based Maintenance Decision Model Based on Reliability

Traction power supply equipments are the core part of the high-speed railway, so the maintenance of the power supply system is crucial for the security of the railway. Based on the research on the durable years of the traction power supply equipments, this paper puts forward the model of testing the traction power supply equipments of the reliable high speed railway. Some practical researches h...

متن کامل

High-Speed Railway Traction Power Supply Equipment Condition-Based Maintenance Decision Model Based on Abrasion Analysis

According to abrasion process of machine equipment parts of overhead line system for traction power supply and characters of wear-out failures, considering on factor changes of all kinds of production conditions in practical operation, set permit of abrasion loss in coordinating with normal distribution, and abrasion loss of parts as random variables, and then establish the relation between mai...

متن کامل

Maintenance management decision model for preventive maintenance strategy on production equipment

In industries, Preventive Maintenance (PM) is not a new practice to minimise the sudden breakdown of production machine. PM will be performed at predetermine intervals to provide a balance between failure cost and component utilisation (aging). However, most of PM interval is based on experience or original equipment manufacturer (OEM) recommendations. Consequently, the benefits from PM are not...

متن کامل

Failure modeling and maintenance optimization for a railway line

This paper presents a model for deterioration and repair of a railway line. The critical failure is “broken line”. Two main failure mechanisms are considered: either shock failure, i.e. an immediate critical failure (without “warning”), or the critical failure occurs as the result of a degradation process, i.e. a degraded failure (crack) occurs first. Various types of inspection and maintenance...

متن کامل

ARIES-RS maintenance approach for high availability

The ARIES-RS tokamak power plant study developed a design approach which has the potential for high availability. One of the keys for high plant availability is a design that allows rapid replacement of the power core sectors. This is achieved by using large maintenance ports for each power core sector, enabling the removal of entire sectors composed of inboard and outboard blankets, neutron sh...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Transactions on Power Delivery

سال: 2018

ISSN: 0885-8977,1937-4208

DOI: 10.1109/tpwrd.2017.2762367