Automatic Rebar Estimation Algorithms for Integrated Project Delivery
نویسندگان
چکیده
منابع مشابه
An Integrated Risk-Based Technique for Project Plan Selection
Selecting an effective project plan is a significant area in the project management. The present paper introduces a technique to identify the project plan efficient frontier for assessing the alternative project plans and selecting the best plan. The efficient frontier includes two criteria: the project cost and the project time. Besides, the paper presents a scheme to incorporate Directed Ac...
متن کاملchannel estimation for mimo-ofdm systems
تخمین دقیق مشخصات کانال در سیستم های مخابراتی یک امر مهم محسوب می گردد. این امر به ویژه در کانال های بیسیم با خاصیت فرکانس گزینی و زمان گزینی شدید، چالش بزرگی است. مقالات متعدد پر از روش های مبتکرانه ای برای طراحی و آنالیز الگوریتم های تخمین کانال است که بیشتر آنها از روش های خاصی استفاده می کنند که یا دارای عملکرد خوب با پیچیدگی محاسباتی بالا هستند و یا با عملکرد نه چندان خوب پیچیدگی پایینی...
Transitioning to Integrated Project Delivery: Potential barriers and lessons learned
Research Question: How do architecture, engineering, and construction (AEC) professionals overcome the most prevalent barriers of implementing IPD? Purpose: To investigate how successful IPD projects overcome legal, cultural, financial, and technological barriers in an effort to achieve wider adoption of IPD by the industry and to provide lessons learned to industry professionals interested in ...
متن کاملAutomatic Bounding Estimation in Modified Nlms Algorithm
Modified Normalized Least Mean Square (MNLMS) algorithm, which is a sign form of NLMS based on set-membership (SM) theory in the class of optimal bounding ellipsoid (OBE) algorithms, requires a priori knowledge of error bounds that is unknown in most applications. In a special but popular case of measurement noise, a simple algorithm has been proposed. With some simulation examples the performa...
متن کاملImplementation of Integrated Project Delivery and Building Information Modeling on a Small Commercial Project
Integrated Project Delivery (IPD) seeks to improve project outcomes through a collaborative approach of aligning the incentives and goals of the project team through shared risk and reward, early involvement of all parties, and a multi-party agreement. The coupling of Building Information Modeling (BIM) with IPD enables a level of collaboration that not only improves efficiency and reduces erro...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Asian Architecture and Building Engineering
سال: 2016
ISSN: 1346-7581,1347-2852
DOI: 10.3130/jaabe.15.411