ATLAS Trigger and DAQ Upgrades for High-Luminosity LHC
نویسندگان
چکیده
منابع مشابه
Communication between Trigger/DAQ and DCS in ATLAS
Within the ATLAS experiment Trigger/DAQ and DCS are both logically and physically separated. Nevertheless there is a need to communicate. The initial problem definition and analysis suggested three subsystems the Trigger/DAQ DCS Communication (DDC) project should support the ability to: 1. exchange data between Trigger/DAQ and DCS; 2. send alarm messages from DCS to Trigger/DAQ; 3. issue comman...
متن کاملThe DataFlow System of the ATLAS Trigger and DAQ
G. Lehmann, J. Bogaerts, M. Ciobotaru, E. Palencia Cortezon, B. DiGirolamo, R. Dobinson, D. Francis, S. Gameiro, P. Golonka, B. Gorini, M. Gruwe, S. Haas, M. Joos, E. Knezo, T. Maeno, L. Mapelli, B. Martin, R. McLaren, C. Meirosu, G. Mornacchi, I. Papadopoulos, J. Petersen, P. de Matos Lopes Pinto, D. Prigent, R. Spiwoks, S. Stancu, L. Tremblet, P. Werner, CERN, Geneva, Switzerland M. Abolins, ...
متن کاملThe ATLAS and CMS Plans for the LHC Luminosity Upgrade
In January 2007 the CERN director general announced the plan for the staged upgrade of the LHC luminosity. The plan foresees a phase 1 upgrade reaching a peak luminosity of 3 × 10 cms followed by phase reaching up to 10 cms. We discuss the physics potential and the experimental challenges of an upgraded LHC running. The detector R&D needed to operate ATLAS and CMS in a very high radiation envir...
متن کاملThe Baseline DataFlow System of the ATLAS Trigger & DAQ
M.!Abolins, A.!Dos!Anjos, M.!Barisonzi, H.P.!Beck, M.!Beretta, R.!Blair, J.!Bogaerts, H.!Boterenbrood, D.!Botterill, M.!Ciobotaru, E.!Palencia!Cortezon, R.!Cranfield, G.!Crone, J.!Dawson, B.!DiGirolamo, R.!Dobinson, Y.!Ermoline, M.L.!Ferrer, D.!Francis, S.!Gadomski, S.!Gameiro, P.!Golonka, B.!Gorini, B.!Green, M.!Gruwe, S. Haas, C.!Haeberli, Y.!Hasegawa, R.!Hauser, C.!Hinkelbein, R.!Hughes-Jone...
متن کاملThe ATLAS Trigger Core Configuration and Execution System in Light of the ATLAS Upgrade for LHC Run 2
During the 2013/14 shutdown of the Large Hadron Collider (LHC) the ATLAS first level trigger (L1) and the data acquisition system (DAQ) were substantially upgraded to cope with the increase in luminosity and collision multiplicity, expected to be delivered by the LHC in 2015. Upgrades were performed at both the L1 stage and the single combined subsequent high level trigger (HLT) stage that has ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: EPJ Web of Conferences
سال: 2017
ISSN: 2100-014X
DOI: 10.1051/epjconf/201716407003