Assessment Risk in Construction Projects in Iraq Using COPRAS-SWARA Combined Method

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

New Product Development Risk Assessment in the Core Banking Using FMEA Combined with COPRAS Method and Grey Relations

The present study tries to investigate the existing risks in the new product development process in the core banking field. Due to its use after production, new product development with the fewest errors and risks is always the subject of discussion and investigation among the researchers of this field. This study aims to investigate the most important risks existing in the new product developm...

متن کامل

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

Dynamic Risk Assessment in Construction Projects Using Bayesian Networks

This paper presents a systemic Bayesian network (BN) based approach for dynamic risk assessment for adjacent buildings in tunnel construction. This approach consists of four steps in detail, namely, hazard analysis, BN learning and BN-based risk analysis. In the dynamic risk analysis framework, the predictive, sensitivity and diagnostic analysis techniques in the Bayesian inference are used to ...

متن کامل

Ergonomic Assessment of Musculoskeletal Disorders' Risk Factors in Construction Workers Using Cornell Questionnaire and WERA Method

Introduction: With regard to high prevalence of musculoskeletal disorders in the construction industry workers, the aim of this study was to investigate the prevalence of musculoskeletal disorders and their relevant risk factors in workers of a construction factory. Methods: This descriptive-analytical cross-sectional study was conducted in 2019. In this regard, 150 workers were selected from ...

متن کامل

Safety risk assessment and ranking in the construction projects with F.M.E.A and fuzzy T.O.P.S.I.S

Abstract Introduction: Construction projects are one of the most important sectors of the economy of the country, which has a high capacity for job creation. Construction projects are part of a huge and strategic set of civil engineering projects that unfortunately have a large share of work-related accidents due to lack of attention to safety. One of the most important issues that can contrib...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Southwest Jiaotong University

سال: 2019

ISSN: 0258-2724

DOI: 10.35741/issn.0258-2724.54.4.28