Assessing interdependent operational, tactical and strategic risks for improved utility master plans

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Improving operational effectiveness of tactical master plans for emergency and elective patients under stochastic demand and capacitated resources

This paper develops a two-stage planning procedure for master planning of elective and emergency patients while allocating at best the available hospital resources. Four types of resources are considered: operating theatre, beds in the medium and in the intensive care units, and nursing hours in the intensive care unit. A tactical plan is obtained by minimizing the deviations of the resources c...

متن کامل

PESTOL - Framework for «Project Evaluation on Strategic, Tactical and Operational Levels»

The paper focuses on the development of the ex-post conceptual holistic framework for Project Evaluation on Strategic, Tactical and Operational Levels, the PESTOL model, by reviewing different definitions of project success and/or failure and combining the findings with the logic framework. The model reflects the project life cycle by considering all project phases, such as identification and c...

متن کامل

Process Frame Instances for Integrating Strategic, Tactical and Operational Information Management in Hospitals

An approach to reduce the complexity of information management is to distinguish it into strategic, tactical and operational management with each of the levels using its own software tools. In practice, the management levels are tightly connected and interact closely. The most evident information that has to be interchanged between the management levels is the information about finished, cancel...

متن کامل

Tactical and operational planning for socially responsible fresh agricultural supply chain

Addressing an integrated decision-making structure for planting and harvesting scheduling may lead to more realistic, accurate, and efficient decision in fresh product supply chain. This study aims to develop an integrated bi-objective tactical and operational planning model for producing and distributing fresh crops. The first objective of the model is to maximize total revenue of supply chain...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Water Research

سال: 2015

ISSN: 0043-1354

DOI: 10.1016/j.watres.2015.02.021