Aspen-HYSYS Simulation of Natural Gas Processing Plant

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Estimation of Power Production Potential from Natural Gas Pressure Reduction Stations in Pakistan Using ASPEN HYSYS

Pakistan is a gas rich but power poor country. It consumes approximately 1, 559 Billion cubic feet of natural gas annually. Gas is transported around the country in a system of pressurized transmission pipelines under a pressure range of 600-1000 psig exclusively operated by two state owned companies i.e. SNGPL (Sui Northern Gas Pipelines Limited) and SSGCL (Sui Southern Gas Company Limited). T...

متن کامل

Process Simulation and Optimization of Crude Oil Stabilization Scheme Using Aspen-HYSYS Software

In this time of energy crises, low production rate against the increasing demand of oil and gas production regularly hampers both domestic and industrial operations. In addition, safety hazards arising from explosion and increase in the cost of production due to pumping cavitation has pose a great challenge on offshore Floating Production Storage and Off-loading (FPSO) terminals. In view of the...

متن کامل

Analysis and Modeling of Vapor Recompressive Distillation Using ASPEN-HYSYS

HYSYS process modeling software was used to analyze the effect of reflux ratio and number of trays on the purity of ethylene in a vapor recompression distillation column and also in an ordinary distillation column. Analysis of data showed that with increased pressure a higher reflux ratio is needed to obtain a purity of 99.9% for both towers. In addition number of trays was varied to see its ef...

متن کامل

Dynamic Simulation and Control of the Demethanizer Unit in Natural Gas Refining Plant

The NGL refinery of the Sirri Island has a major role in the production of high-value products. One of the most important refinery units is the demethanizer unit, comprising of a complex network of distillation towers and heat exchangers. In the first step, using the Aspen Hysys software, a proper steady state model was developed for this unit in which the simulation of the main equipment that ...

متن کامل

Simulation of Bioreactors for PHB Production from Natural Gas

Recently, many economic studies of poly(3-hydroxybutyrate) PHB production on an industrial scale, and the impact of replacing petrochemical polymers by PHB were carried out, clearly indicating that the most crucial factors to reduce the cost of producing biopolymers are allotted to the application of microbial production strains capable of high productivi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Chemical Engineering

سال: 2012

ISSN: 2408-8617,2221-7436

DOI: 10.3329/jce.v26i1.10186