Are interim management statements redundant?
نویسندگان
چکیده
منابع مشابه
Policies, Guidelines and Consensus Statements: Pharmacologic Management of Type 2 Diabetes-2015 Interim Update.
The initial draft of this commentary was prepared by William Harper MD, FRCPC, Maureen Clement MD, CCFP, Ronald Goldenberg MD, FRCPC, FACE, Amir Hanna MB, BCh, FRCPC, FACP, Andrea Main BScPhm, CDE, Ravi Retnakaran MD, MSc, FRCPC, Diana Sherifali RN, PhD, CDE, Vincent Woo MD, FRCPC, Jean-François Yale MD, CSPQ, FRCPC, and Alice Y.Y. Cheng MD, FRCPC on behalf of the Steering Committee for the Can...
متن کاملAddendum to policies, guidelines and consensus statements: pharmacologic management of type 2 diabetes: 2015 interim update.
An interim update of the chapter titled Pharmacologic Management of Type 2 Diabetes in the 2013 Clinical Practice Guidelines was recently published in Canadian Journal of Diabetes; it incorporates the sodium glucose linked transporter 2 (SGLT2) inhibitor class (1). Since the publication of the update, another SGLT2 inhibitor has received notice of compliance from Health Canada (2). The article’...
متن کاملStatements on Management Accounting
This statement was approved for issuance as a Statement on Management Accounting by the Management Accounting Committee (MAC) of the Institute of Management Accountants (IMA®). IMA appreciates the collaborative efforts of the Finance Business Solutions Center at Arthur Andersen LLP and the work of Dr. C.J. McNair, CMA, of Babson College, who drafted the manuscript. Special thanks go to Randolf ...
متن کاملOn Eliminating Redundant Computation from High-Level Array Statements
High-level array programming languages are well-suited for scientific computing. Such languages free the programmer from the responsibility of managing burdensome low-level details that complicate programming in languages like C and Fortran. But these details do not vanish. We argue that the compiler should relieve the programmer of this burden. In this paper, we present a compiler optimization...
متن کاملZoar Levee Interim Risk Management
The U.S. Army Corps of Engineers elevated Zoar Levee and Diversion Dam to a Dam Safety Action Class I (urgent and compelling) ranking due to seepage concerns. An accelerated program is in progress to address project deficiencies which include seepage through the levee’s glacial outwash foundation, through a fractured rock knoll beneath the levee, and through the dam’s fractured rock abutments a...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Accounting and Business Research
سال: 2015
ISSN: 0001-4788,2159-4260
DOI: 10.1080/00014788.2014.1002444