Applying the Fuzzy PERT Method in Project Management: A Real-Life Case Study

نویسندگان

چکیده

Time is the most precious resource for any business simply because no one can bring time back. Therefore, there a huge need to be able control accurately. Also, competitiveness between companies increased value of time. Many investments were allocated build methodologies that help use effectively. Because it became fact speed work accomplishment main factor being considerable competitor. Planning future projects usually relays on non-fixed but mostly expected data. It more reliable fuzzy methods this situation. In study, Fuzzy PERT (FPERT) was used as project management technique plan construction marble factory from establishment phase machines will later on. FPERT showed realistic results than classical method would. Out 16 routes, final result completion (90.9,122.1,151.9) days which determined after triangular numbers activity times in entire project. This article aims prove efficiency especially conducted planned through real-life case study.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The role of Real option in e-business Risk management: The case of E-treasury project

Implementing information technology projects requires a calculated process to prevent failure. At the same time application of information technology in organizations faces various potential risks. Exploring information technology environment in organizations reveals the potential risks and provides a structure for comprehensive risk management. There are various methods available for risk mana...

متن کامل

The role of Real option in e-business Risk management: The case of E-treasury project

Implementing information technology projects requires a calculated process to prevent failure. At the same time application of information technology in organizations faces various potential risks. Exploring information technology environment in organizations reveals the potential risks and provides a structure for comprehensive risk management. There are various methods available for risk mana...

متن کامل

the test for adverse selection in life insurance market: the case of mellat insurance company

انتخاب نامساعد یکی از مشکلات اساسی در صنعت بیمه است. که ابتدا در سال 1960، توسط روتشیلد واستیگلیتز مورد بحث ومطالعه قرار گرفت ازآن موقع تاکنون بسیاری از پژوهشگران مدل های مختلفی را برای تجزیه و تحلیل تقاضا برای صنعت بیمه عمر که تماما ناشی از عدم قطعیت در این صنعت میباشد انجام داده اند .وهدف از آن پیدا کردن شرایطی است که تحت آن شرایط انتخاب یا کنار گذاشتن یک بیمه گزار به نفع و یا زیان شرکت بیمه ...

15 صفحه اول

Solving Fuzzy PERT Using Gradual Real Numbers

From a set of a partially ordered tasks, one goal of the project scheduling problem is to compute earliest starting dates, latest starting dates and floats of the different tasks, and to identify critical tasks. When durations of tasks are not precisely known, the problem is much trickier. Recently we provided polynomial algorithms to compute upper bound of activity floats in the interval-value...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International journal of computational and experimental science and engineering

سال: 2023

ISSN: ['2149-9144']

DOI: https://doi.org/10.22399/ijcesen.1262975