Applying Minimum-Risk Criterion to Stochastic Hub Location Problems
نویسندگان
چکیده
منابع مشابه
Stochastic uncapacitated hub location
We study stochastic uncapacitated hub location problems in which uncertainty is associated to demands and transportation costs. We show that the stochastic problems with uncertain demands or dependent transportation costs are equivalent to their associated deterministic expected value problem (EVP), in which random variables are replaced by their expectations. In the case of uncertain independe...
متن کاملMinimum risk criterion for uncertain production planning problems
This paper considers a new class of multi-product source and multi-period fuzzy random production planning problems with minimum risk and service levels where both the demands and the production costs are assumed to be uncertain and characterized as fuzzy random variables with known distributions. The proposed problems are formulated as a fuzzy random production planning (FRPP) model by maximiz...
متن کاملHierarchical Facility Location and Hub Network Problems: A literature review
In this paper, a complete review of published researches about hierarchical facility location and hub network problems is presented. Hierarchical network is a system where facilities with different service levels interact in a top-down way or vice versa. In Hierarchical systems, service levels are composed of different facilities. Published papers from (1970) to (2015) have been studied and a c...
متن کاملHub location problems in transportation networks
In this paper we propose a 4-index formulation for the uncapacitated multiple allocation hub location problem tailored for urban transport and liner shipping network design. This formulation is very tight and most of the tractable instances for MIP solvers are optimally solvable at the root node. While the existing state-of-the-art MIP solvers fail to solve even small size instances of problem,...
متن کاملMulti-period hub location problems in transportation
Many transport service providers operate on hub-and-spoke network structures. Major operators may have several dedicated hub facilities that are leased for a time horizon rather than being owned or constructed. For a given discrete planning horizon, service providers must decide on the location of the hub ports (i.e. terminals), the period when the lease contract starts, the period when the exi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Procedia Engineering
سال: 2012
ISSN: 1877-7058
DOI: 10.1016/j.proeng.2012.01.307