Application of Fuzzy Scheduling to Pipe Assembly Process
نویسندگان
چکیده
منابع مشابه
an application of fuzzy logic for car insurance underwriting
در ایران بیمه خودرو سهم بزرگی در صنعت بیمه دارد. تعیین حق بیمه مناسب و عادلانه نیازمند طبقه بندی خریداران بیمه نامه براساس خطرات احتمالی آنها است. عوامل ریسکی فراوانی می تواند بر این قیمت گذاری تاثیر بگذارد. طبقه بندی و تعیین میزان تاثیر گذاری هر عامل ریسکی بر قیمت گذاری بیمه خودرو پیچیدگی خاصی دارد. در این پایان نامه سعی در ارائه راهی جدید برای طبقه بندی عوامل ریسکی با استفاده از اصول و روش ها...
Application of fuzzy logic to multi-objective scheduling problems in robotic flexible assembly cells
This paper is aimed at developing a methodology to solve a multi-objective problem in robotic flexible assembly cells. The proposed methodology is based on three main steps: (1) scheduling of the RFACs using different common rules, (2) normalisation of the scheduling outcomes, and (3) selection of the optimal scheduling rules, using a fuzzy inference system. In this paper, four rules, namely sh...
متن کاملIntegrated Process Planning and Scheduling and Multimode Resource Constrained Project Scheduling: Ship Block Assembly Application
متن کامل
Application of a Fuzzy-simulation Model of Scheduling Robotic Flexible Assembly Cells
This study describes the application of the developed model to the scheduling of the Robotic Flexible Assembly Cells (RFACs). The present study is a continuation of the paper titled “Development of a FuzzySimulation Model of Scheduling Robotic Flexible Assembly Cells”. This new model for multi-objective scheduling problems in RFACs was based on combining a fuzzy-based mathematical model with si...
متن کاملBi-objective Optimization for Just in Time Scheduling: Application to the Two-Stage Assembly Flow Shop Problem
This paper considers a two-stage assembly flow shop problem (TAFSP) where m machines are in the first stage and an assembly machine is in the second stage. The objective is to minimize a weighted sum of earliness and tardiness time for n available jobs. JIT seeks to identify and eliminate waste components including over production, waiting time, transportation, inventory, movement and defective...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of the Society of Naval Architects of Japan
سال: 2003
ISSN: 1884-2070,0514-8499
DOI: 10.2534/jjasnaoe1968.2003.194_227