Application of Computational Tools to Analyze and Test Mini Gas Turbine
نویسندگان
چکیده
منابع مشابه
construction and validation of translation metacognitive strategy questionnaire and its application to translation quality
like any other learning activity, translation is a problem solving activity which involves executing parallel cognitive processes. the ability to think about these higher processes, plan, organize, monitor and evaluate the most influential executive cognitive processes is what flavell (1975) called “metacognition” which encompasses raising awareness of mental processes as well as using effectiv...
Mini two-shaft gas turbine exergy analysis with a proposal to decrease exergy destruction
In this case study, exergy analysis is applied to a mini two-shaft gas turbine which is located in Islamic Azad University Khomeini Shahr Branch`s Thermodynamics laboratory and a proposal presented to make exergy destruction less using a Heat Recovery Water Heater (HRWH). Calculations were done for N2=20000 (rpm) constant and various N1 and after that for N1=600...
متن کاملExperimental and Computational Study on Hydrodynamic of a Downscaled Mini Vessel USP Dissolution Test Apparatus II
Although not listed on the United States Pharmacopeia (USP), like standard USP 2, small volume USP 2 dissolution apparatus has gained a great deal of attention, especially for cases where small amount of drug product is available for testing in research and design step or evaluations are to be made on a tablet containing trace amounts of the active pharmaceutical ingredient. In this work, first...
متن کاملMulti-Intensity-Layer PIV application to a Gas Turbine Combustor
The new technique ‘Multi-Intensity-Layer PIV’ was applied to a gas turbine combustor to detect the instantaneous droplet distribution and its behavior. Mie scattering theory is applied to the conventional Particle Image Velocimetry and the technique enables us to detect the instantaneous planar droplet velocity and size information. This M-PIV technique was evaluated with a generally used indus...
متن کاملDesign and Test of a Large Two-Shaft Gas Turbine
The largest two-shaft gas turbine in the United States has been operated in combined cycle service at the Oklahoma Gas and Electric Company Horseshoe Lake Station since May 1963. The same design unit has been operated in peaking and stand-by service at Public Service Electric and Gas (Essex, N. J.) station since December 1963. The 0.G & E. unit has a NEMA rating of 25 Mw base load. The PSEG uni...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Advanced Network, Monitoring and Controls
سال: 2017
ISSN: 2470-8038
DOI: 10.21307/ijanmc-2017-003