Application of a Combined Model to Spare Parts Consumption Prediction

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Initial Electronic Spare Parts Stock and Consumption Forecasting

There is a consensus that conventional continuous demand distribution methods are not appropriate for forecasting replacement parts. However, many forecasting tools available in market still use them. This work presents an application of the Poisson distribution to forecast the needs of electronic spare parts. Using basic stock management notions and usual concepts of reliability, availability ...

متن کامل

A combined Wavelet- Artificial Neural Network model and its application to the prediction of groundwater level fluctuations

Accurate groundwater level modeling and forecasting contribute to civil projects, land use, citys planning and water resources management. Combined Wavelet-Artificial Neural Network (WANN) model has been widely used in recent years to forecast hydrological and hydrogeological phenomena. This study investigates the sensitivity of the pre-processing to the wavelet type and decomposition level in ...

متن کامل

On spare parts optimization

In the book “Optimal inventory modeling of systems: multi-echelon techniques” the author Craig Sherbrooke, who has developed several important model in this area, describes a part of the model cosidered in this manuscript as follows (in “aircraft language”): “When a malfunction is diagnosed on an aircraft, the malfuncioning item is removed from the aircraft and brought into base supply. If a sp...

متن کامل

A Multi-Item Spare Parts Inventory Model with Customer Differentiation

We consider a single warehouse where spare parts of multiple stock-keeping units are kept on stock to serve customers with (close-to-)identical machines. Customers are divided into multiple customer classes, and a target aggregate fill rate is set per class. In order to get differentiated service levels, critical level policies are assumed. We formulate a multi-item, single-stage spare parts in...

متن کامل

Demand Forecasting Model of Port Critical Spare Parts

Demand forecasting for port critical spare parts (CSP) is notoriously difficult as it is expensive, lumpy and intermittent with high variability. In this paper, some influential factors which have an effect on CSP consumption were proposed according to port CSP characteristics and historical data. And analytic hierarchy process (AHP) is used to sieve out the more influential factors. Combined w...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: The Open Cybernetics & Systemics Journal

سال: 2015

ISSN: 1874-110X

DOI: 10.2174/1874110x01509010674