Android-Based RCSM Application for Implementation of Preventive Maintenance on CNC Production Machine

نویسندگان

چکیده

Preventive maintenance (PM) implementation at POLMAN Bandung is scheduled to follow the lecture schedule so that of activities does not interfere with process. Even though scheduling preventive has been made quite well, there are problems in its implementation, including some were detected previous PM both form activity reports and machine history updates. This can confuse subsequent pm implementers, as it result mishandling. As for cause problem, two possibilities, namely carried out or out, but on prepared stored by procedures (human error). To overcome this, researchers developed an Android-based application functions a reminder, recorder, controller, process, named Reminder & Control System Management (RCSM). RCSM will remind, be schedule, carry remind mechanisms, information broadcast validation until completion acceptable relevant authorities. Likewise, reporting recording engine system created similar mechanism. The results have achieved software prototype reaching 100% several field trials out. direct implementers avoid misuse data recapitulated.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

application of upfc based on svpwm for power quality improvement

در سالهای اخیر،اختلالات کیفیت توان مهمترین موضوع می باشد که محققان زیادی را برای پیدا کردن راه حلی برای حل آن علاقه مند ساخته است.امروزه کیفیت توان در سیستم قدرت برای مراکز صنعتی،تجاری وکاربردهای بیمارستانی مسئله مهمی می باشد.مشکل ولتاژمثل شرایط افت ولتاژواضافه جریان ناشی از اتصال کوتاه مدار یا وقوع خطا در سیستم بیشتر مورد توجه می باشد. برای مطالعه افت ولتاژ واضافه جریان،محققان زیادی کار کرده ...

15 صفحه اول

Maintenance management decision model for preventive maintenance strategy on production equipment

In industries, Preventive Maintenance (PM) is not a new practice to minimise the sudden breakdown of production machine. PM will be performed at predetermine intervals to provide a balance between failure cost and component utilisation (aging). However, most of PM interval is based on experience or original equipment manufacturer (OEM) recommendations. Consequently, the benefits from PM are not...

متن کامل

development and implementation of an optimized control strategy for induction machine in an electric vehicle

in the area of automotive engineering there is a tendency to more electrification of power train. in this work control of an induction machine for the application of electric vehicle is investigated. through the changing operating point of the machine, adapting the rotor magnetization current seems to be useful to increase the machines efficiency. in the literature there are many approaches wh...

15 صفحه اول

Joint optimization of production scheduling and machine group preventive maintenance

Joint optimization models were developed combining group preventive maintenance of a series system and production scheduling. In this paper, we propose a joint optimization model to minimize the total cost including production cost, preventive maintenance cost, minimal repair cost for unexpected failures and tardiness cost. The total cost depends on both the production process and the machine m...

متن کامل

JIT single machine scheduling problem with periodic preventive maintenance

This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Sinkron : jurnal dan penelitian teknik informatika

سال: 2023

ISSN: ['2541-2019', '2541-044X']

DOI: https://doi.org/10.33395/sinkron.v8i2.12290