Analysis of Construction Delay due to Poor Planning using Fuzzy Logic Technique
نویسندگان
چکیده
منابع مشابه
Optimizing Linear Prgramming Technique Using Fuzzy Logic
The purpose of this paper is to point to the usefulness of applying a linear mathematical formulation of fuzzy multiple criteria objective decision methods in organising business activities. In this respect fuzzy parameters of linear programming are modelled by preference-based membership functions. This paper begins with an introduction and some related research followed by some fundamentals o...
متن کاملdesign of an analog fuzzy logic controller chip
fuzzy logic has been developed over the past three decades into a widely applied techinque in classification and control engineering. today fuzzy logic control is one of the most important applications of fuzzy set theory and specially fuzzy logic. there are two general approachs for using of fuzzy control, software and hardware. integrated circuits as a solution for hardware realization are us...
15 صفحه اولPrediction and evaluation of runoff data in south of Qazvin watershed, using a fuzzy logic technique
The important criteria for designing in the most of hydrologic and hydraulic construction projects are based on runoff or peak-flow of water. Mostly, this measure and criterion is calculated or estimated by stochastic data. Another feature of these data that are used in watershed hydrological studies is their impreciseness. Therefore, in this study, in order to deal with uncertainty and impreci...
متن کاملan application of fuzzy logic for car insurance underwriting
در ایران بیمه خودرو سهم بزرگی در صنعت بیمه دارد. تعیین حق بیمه مناسب و عادلانه نیازمند طبقه بندی خریداران بیمه نامه براساس خطرات احتمالی آنها است. عوامل ریسکی فراوانی می تواند بر این قیمت گذاری تاثیر بگذارد. طبقه بندی و تعیین میزان تاثیر گذاری هر عامل ریسکی بر قیمت گذاری بیمه خودرو پیچیدگی خاصی دارد. در این پایان نامه سعی در ارائه راهی جدید برای طبقه بندی عوامل ریسکی با استفاده از اصول و روش ها...
Fuzzy Logic: An Appropriate Technique for Effective Risk Analysis and Decision Making for Construction Projects
-Risk management is an important and crucial matter for project manager as the success of any project very much depends on the associated risks and uncertainties in the project. A systematic risk management process can be divided into risk classification, risk identification, risk analysis and risk response. Risk analysis is the second stage in the Project risk management (PRM) where risks whic...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal for Research in Applied Science and Engineering Technology
سال: 2018
ISSN: 2321-9653
DOI: 10.22214/ijraset.2018.7072