Analysis of a Priority Queue with Phase-Type Service and Failures

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

On Finite Queue with Two Types of Failures and Preemptive Priority (RESEARCH NOTE)

We study the single server queueing system with two types of Abstract failure to servicechannels including the preemptive priority to the repair of major failure. The units arrive at thesystem in a poisson fashion and are served exponenitally. The steady - state probabilities ofvarious states by using generating function have been obtained.

متن کامل

Analysis of an M/G/1 Queue with Multiple Vacations, N-policy, Unreliable Service Station and Repair Facility Failures

This paper studies an M/G/1 repairable queueing system with multiple vacations and N-policy, in which the service station is subject to occasional random breakdowns. When the service station breaks down, it is repaired by a repair facility. Moreover, the repair facility may fail during the repair period of the service station. The failed repair facility resumes repair after completion of its re...

متن کامل

A Finite Capacity Priority Queue with Discouragement

In this paper we report on a study of a two level preemptive priority queue with balking and reneging for lower priority level. The inter-arrival and the service times for both levels follow exponential distribution. We use a finite difference equation approach for solving the balance equations of the governing queuing model whose states are described by functions of one independent variable. H...

متن کامل

analysis of an m/g/1 queue with multiple vacations, n-policy, unreliable service station and repair facility failures

this paper studies an m/g/1 repairable queueing system with multiple vacations and n-policy, in which the service station is subject to occasional random breakdowns. when the service station breaks down, it is repaired by a repair facility. moreover, the repair facility may fail during the repair period of the service station. the failed repair facility resumes repair after completion of its re...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Stochastic Analysis

سال: 2016

ISSN: 2090-3332,2090-3340

DOI: 10.1155/2016/9152701