Analysis of 110kV cable terminal abnormal partial discharge
نویسندگان
چکیده
منابع مشابه
Medium Voltage Cable System Partial Discharge
This chapter represents the state of the art at the time of release. Readers are encouraged to consult the link below for the version of this chapter with the most recent release date: Neither NEETRAC, GTRC, any member of NEETRAC or any cosponsor nor any person acting on behalf of any of them: a) Makes any warranty or representation whatsoever, express or implied, i. With respect to the use of ...
متن کاملPartial Discharge (PD) HV and EHV Power Cable Systems
This chapter represents the state of the art at the time of release. Readers are encouraged to consult the link below for the version of this chapter with the most recent release date: Neither NEETRAC, GTRC, any member of NEETRAC or any cosponsor nor any person acting on behalf of any of them: a) Makes any warranty or representation whatsoever, express or implied, i. With respect to the use of ...
متن کاملOn-line Partial Discharge Monitor System of XLPE Power Cable Based on Virtual Instrument
High voltage XLPE power cable is a very important part of power system. The degree of electric-tree aging in the cable can be estimated effectually by measuring partial discharge. An on-line partial discharge monitor system of XLPE power cable was developed based on the virtual instrument designing conception. This system has the advantage of wide analog bandwidth, excellent anti-interference a...
متن کاملPartial Discharge Testing of Defective Three-phase Pilc Cable under Rated Conditions
The ability to accurately monitor the health of power distribution plant is a very attractive prospect for utility companies. This capability would provide a system that engineers could use to assess the real-time state of the network. Analysis of the data produced could allow for more informed decisions to be made in the areas of asset replacement and maintenance scheduling amongst others. It ...
متن کاملUhf Monitoring of Partial Discharge in Substation Equipment Using a Novel Multi-sensor Cable Loop
This paper describes the development of a partial discharge measurement system that utilises a multiplexed approach to ultra-high-frequency monitoring on many pieces of equipment using a single cable loop connected to only two sampling channels. It is envisioned that the system could be used in partial discharge monitoring of medium voltage metal-enclosed switchgear, or several power transforme...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IOP Conference Series: Earth and Environmental Science
سال: 2020
ISSN: 1755-1315
DOI: 10.1088/1755-1315/617/1/012027