Analysis for EPB Shield Bracket Based on Ansys
نویسندگان
چکیده
منابع مشابه
Application of artificial intelligence methods for estimation of maximum surface settlement caused by EPB shield tunneling
Maximum surface settlement (MSS) is an important parameter for the design and operation of earth pressure balance (EPB) shields that should determine before operate tunneling. Artificial intelligence (AI) methods are accepted as a technology that offers an alternative way to tackle highly complex problems that can’t be modeled in mathematics. They can learn from examples and they are able...
متن کاملapplication of upfc based on svpwm for power quality improvement
در سالهای اخیر،اختلالات کیفیت توان مهمترین موضوع می باشد که محققان زیادی را برای پیدا کردن راه حلی برای حل آن علاقه مند ساخته است.امروزه کیفیت توان در سیستم قدرت برای مراکز صنعتی،تجاری وکاربردهای بیمارستانی مسئله مهمی می باشد.مشکل ولتاژمثل شرایط افت ولتاژواضافه جریان ناشی از اتصال کوتاه مدار یا وقوع خطا در سیستم بیشتر مورد توجه می باشد. برای مطالعه افت ولتاژ واضافه جریان،محققان زیادی کار کرده ...
15 صفحه اولModel Reference Control for Bulkhead Pressure of EPB Shield in Tunneling
The supporting pressure is achieved through control of the incoming and outgoing materials in the head chamber in shield tunneling, i.e., through regulation of the screw conveyor rotation, thrust force of jacks and the excavation advance rate. The discrete state equation of controlling system is derived based on mechanical equilibrium principle. The objective function of model reference control...
متن کاملThe dynamic characteristic analysis of spindle based on ANSYS
The basic concept of dynamic characteristics of spindle is introduced. The first ten order vibration mode and natural frequency of shaft are obtained by modal analysis and harmonic response analysis using software ANSYS. The deformation trend of spindle under resonance state is analysed and the contrast between theory and simulation critical speed is done. The frequency response curve of spindl...
متن کاملUse of a 10.22 m diameter EPB shield: a case study in Beijing subway construction
INTRODUCTION Beijing subway line 14 includes four stations and approximately 2.8 km of tunnels between the Dongfengbeiqiao and Jingshunlu areas of the city. Due to the surface and underground space limitations of this section, a double-track running tunnel instead of two single-track running tunnels was adopted to connect the two stations. The double-track tunnels were excavated by a 10.22 m di...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Modern Applied Science
سال: 2014
ISSN: 1913-1852,1913-1844
DOI: 10.5539/mas.v8n4p29