ANALYSING DELAY IMPACT FROM POTENTIAL RISK FACTORS ON PROJECT DELIVERY OF OIL AND GAS PIPELINE: A CASE STUDY IN IRAQ

نویسندگان

چکیده

The aim of this paper is to present the design and specifications an integrated Delay Analysis Framework (DAF), which could be used quantify delay caused by Risk Factors (RFs) in Oil Gas Pipelines (OGPs) projects a simple systematic way. main inputs DAF are (i) potential list RFs their impact levels on estimated maximum minimum duration each task. Monte Carlo Simulation within @Risk simulator was key process algorithm that associated RFs. output amount OGP project. functionalities developed were evaluated using case study newly project, south Iraq. It found project might have delayed 45 days if neglected consideration with at construction stage. concludes identifying analysing advance will help reducing improving effectiveness delivery taking suitable risk mitigation measures.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Quantitative risk management in gas injection project: a case study from Oman oil and gas industry

The purpose of this research was to study the recognition, application and quantification of the risks associated in managing projects. In this research, the management of risks in an oil and gas project is studied and implemented within a case company in Oman. In this study, at first, the qualitative data related to risks in the project were identified through field visits and extensive interv...

متن کامل

Assessing Human Risk Factors in Oil and Gas Projects: Case of Pars Oil and Gas Company

The purpose of this study is to provide a comprehensive framework for analyzing risk factors in oil and gas projects. The proposed approach in this study consists of several parts: In the first part, 19 common potential risks in the projects of the Pars Oil and Gas Company were finalized by using Lavasheh Validation method in six groups; these factors were identified through review of previous ...

متن کامل

Assessing Human Risk Factors in Oil and Gas Projects: Case of Pars Oil and Gas Company

The purpose of this study is to provide a comprehensive framework for analyzing risk factors in oil and gas projects. The proposed approach in this study consists of several parts: In the first part, 19 common potential risks in the projects of the Pars Oil and Gas Company were finalized by using Lavasheh Validation method in six groups; these factors were identified through review of previous ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Construction Research

سال: 2021

ISSN: ['2630-5089']

DOI: https://doi.org/10.30564/jcr.v2i2.2863