Analisa Perhitungan Pekerjaan Reparasi Kapal Dengan Metode Critical Path Method (CPM)
نویسندگان
چکیده
منابع مشابه
Klasifikasi Data Cardiotocography Dengan Integrasi Metode Neural Network Dan Particle Swarm Optimization
Backpropagation (BP) adalah sebuah metode yang digunakan dalam training Neural Network (NN) untuk menentukan parameter bobot yang sesuai. Proses penentuan parameter bobot dengan menggunakan metode backpropagation sangat dipengaruhi oleh pemilihan nilai learning rate (LR)-nya. Penggunaan nilai learning rate yang kurang optimal berdampak pada waktu komputasi yang lama atau akurasi klasifikasi yan...
متن کاملHealth, nutrition and hydration status of Indonesian workers: a preliminary study in two different environmental settings
Metode: Studi potong lintang komparatif dipilih dengan melibatkan dua kelompok pekerja pabrik, masing-masing terdiri dari 39 orang laki-laki sehat berusia 25-45 tahun dari dua lingkungan kerja yang berbeda, yaitu yang terpapar langsung dengan suhu tinggi dan yang bekerja di ruangan bersuhu sejuk. Data yang diperoleh meliputi data hasil pemeriksaan fisik, berat, tinggi badan, lingkar pinggang da...
متن کاملSitotoksisitas resin akrilik hybrid setelah penambahan glass fiber dengan metode berbeda (Cytotoxicity of the hybrid acrylic resin after glass fiber reinforcement with difference method)
Glass fiber reinforcement of the hybrid acrylic resin with difference method can enhance residual monomer content of the material; it can cause cytotoxic effect on fibroblast cells. The purpose of this study was to know the cytotoxicity of hybrid acrylic resins after glass fiber reinforcement with difference method on the cultured fibroblasts. The squared specimens of 10 mm in length, 10 mm in ...
متن کاملCPM: A Covariance-preserving Projection Method
Dimension reduction is critical in many areas of data mining and machine learning. In this paper, a Covariance-preserving Projection Method (CPM for short) is proposed for dimension reduction. CPM maximizes the class discrimination and also preserves approximately the class covariance. The optimization involved in CPM can be formulated as low rank approximations of a collection of matrices, whi...
متن کاملCritical Path Method for Flexible Job Shop Scheduling Problem with Preemption
This paper addressed a Flexible Job shop Scheduling Problem (FJSP) with the objective of minimization of maximum completion time (Cmax) which job splitting or lot streaming is allowed. Lot streaming is an important technique that has been used widely to reduce completion time of a production system. Due to the complexity of the problem; exact optimization techniques such as branch and bound alg...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: SPECTA Journal of Technology
سال: 2020
ISSN: 2622-9099,2549-2713
DOI: 10.35718/specta.v4i1.172