Analisa Infrastruktur Desa Sukaci-Baros Dengan Metode Critical Path Method (CPM)

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Baros Method Critical Analysis(bariatric Analysis and Reporting System).

INTRODUCTION Although it has received several criticisms, which is considered to be the most effective method used for global assessment of morbid obesity surgical treatment, still needs to be updated. OBJECTIVE Critical analysis of BAROS constitution and method. METHOD BAROS as headings was searched in literature review using data from the main bariatric surgery journals until 2009. RESU...

متن کامل

Klasifikasi Data Cardiotocography Dengan Integrasi Metode Neural Network Dan Particle Swarm Optimization

Backpropagation (BP) adalah sebuah metode yang digunakan dalam training Neural Network (NN) untuk menentukan parameter bobot yang sesuai. Proses penentuan parameter bobot dengan menggunakan metode backpropagation sangat dipengaruhi oleh pemilihan nilai learning rate (LR)-nya. Penggunaan nilai learning rate yang kurang optimal berdampak pada waktu komputasi yang lama atau akurasi klasifikasi yan...

متن کامل

Health, nutrition and hydration status of Indonesian workers: a preliminary study in two different environmental settings

Metode: Studi potong lintang komparatif dipilih dengan melibatkan dua kelompok pekerja pabrik, masing-masing terdiri dari 39 orang laki-laki sehat berusia 25-45 tahun dari dua lingkungan kerja yang berbeda, yaitu yang terpapar langsung dengan suhu tinggi dan yang bekerja di ruangan bersuhu sejuk. Data yang diperoleh meliputi data hasil pemeriksaan fisik, berat, tinggi badan, lingkar pinggang da...

متن کامل

Sitotoksisitas resin akrilik hybrid setelah penambahan glass fiber dengan metode berbeda (Cytotoxicity of the hybrid acrylic resin after glass fiber reinforcement with difference method)

Glass fiber reinforcement of the hybrid acrylic resin with difference method can enhance residual monomer content of the material; it can cause cytotoxic effect on fibroblast cells. The purpose of this study was to know the cytotoxicity of hybrid acrylic resins after glass fiber reinforcement with difference method on the cultured fibroblasts. The squared specimens of 10 mm in length, 10 mm in ...

متن کامل

Application of DESA Design Method in Object-Oriented Software Systems

To reduce complexity in software systems it is essential to minimize the functional dependencies in them. Functional dependency can be caused by the internal logic (model) of the system as well as the user interface. It is then vital to locate the source of the dependency, so that it can be removed. Our method “Design Equations for Systems Analysis”, or DESA, offers an opportunity to accomplish...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Jurnal Sistem dan Manajemen Industri

سال: 2017

ISSN: 2580-2895,2580-2887

DOI: 10.30656/jsmi.v1i1.167