An Optimization Model for Closed-Loop Supply Chain Scheduling Problem

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Inexact-Fuzzy-Stochastic Optimization Model for a Closed Loop Supply Chain Network Design Problem

The development of optimization and mathematical models for closed loop supply chain (CLSC) design has attracted considerable interest over the past decades. However, the uncertainties that are inherent in the network design and the complex interactions among various uncertain parameters are challenging the capabilities of the developed tools. The aim of this paper, therefore, is to propose a n...

متن کامل

an inexact-fuzzy-stochastic optimization model for a closed loop supply chain network design problem

the development of optimization and mathematical models for closed loop supply chain (clsc) design has attracted considerable interest over the past decades. however, the uncertainties that are inherent in the network design and the complex interactions among various uncertain parameters are challenging the capabilities of the developed tools. the aim of this paper, therefore, is to propose a n...

متن کامل

Fuzzy Mathematical Model For A Lot-Sizing Problem In Closed-Loop Supply Chain

The aim of lot sizing problems is to determine the periods where production takes place and the quantities to be produced in order to satisfy the customer demand while minimizing the total cost. Due to its importance on the efficiency of the production and inventory systems, Lot sizing problems are one of the most challenging production planning problems and have been studied for many years wit...

متن کامل

A Bi-objective Mathematical Model for Closed-loop Supply Chain Network Design Problem

In this paper, a bi-objective mixed-integer linear optimization model for Closed-loop Supply Chain Network Design Problem (CLSCND) is developed. The proposed model includes both the forward and reverse directions and includes different types of facilities, namely, manufacturing/remanufacturing centers, warehouses, and disassembly centers. The first objective function tried to minimize the total...

متن کامل

An Optimization Model for Multi-objective Closed-loop Supply Chain Network under uncertainty: A Hybrid Fuzzy-stochastic Programming Method

In this research, we address the application of uncertaintyprogramming to design a multi-site, multi-product, multi-period,closed-loop supply chain (CLSC) network. In order to make theresults of this article more realistic, a CLSC for a case study inthe iron and steel industry has been explored. The presentedsupply chain covers three objective functions: maximization ofprofit, minimization of n...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Industrial Management Perspective

سال: 2020

ISSN: 2645-4165

DOI: 10.29252/jimp.10.3.29