An Optimization Approach for Shovel Allocation to Minimize Fuel Consumption in Open-pit Mines: Case of Heterogeneous Fleet of Shovels.

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Development of a goal programming model for optimization of truck allocation in open pit mines

Truck and shovel operations comprise approximately 60% of the total operating costs in open pit mines. In order to increase productivity and reduce the cost of mining operations, it is essential to manage the equipment used with high efficiency. In this work, the chance-constrained goal programing (CCGP) model presented by Michalakopoulos and Panagiotou is developed to determine an optimal truc...

متن کامل

An Approach to Locate an in Pit Crusher in Open Pit Mines

Transportation costs are a significant part of capital and operating costs of large open pit mines. Cost efficiency and high reliability of in pit crushing and conveying systems compared to conventional truck-shovel system makes it more appealing to be utilized in modern mining activities. In this paper the suitable location of an in pit crusher is investigated as a single hub location problem....

متن کامل

Application of simulated annealing for optimization of blasting costs due to air overpressure constraints in open-pit mines

Estimating the costs of blasting operations is an important parameter in open-pit mining. Blasting and rock fragmentation depend on two groups of variables. The first group consists of mass properties, which are uncontrollable, and the second one is the drill-and-blast design parameters, which can be controlled and optimized. The design parameters include burden, spacing, hole length, hole diam...

متن کامل

A new developed model to determine waste dump site selection in open pit mines: An approach to minimize haul road construction cost

Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displacing by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main w...

متن کامل

A Mathematical Model to Optimize Allocation Sequence in Dispatching Problem

Truck-Shovel fleet, as the most common transportation system in open-pit mines, has a significant part of mining costs, for which optimal management can lead to substantial cost reductions. Among the available dispatch mathematical models, the multi-stage approach is well suited for allocating trucks to respected shovels in a dynamic dispatching program. However, with this kind of modeling sequ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IFAC-PapersOnLine

سال: 2019

ISSN: 2405-8963

DOI: 10.1016/j.ifacol.2019.09.196