An Iterated Local Search Algorithm for a Place Scheduling Problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Iterated Local Search Algorithm for the Constrained Two-Dimensional Non-Guillotine Cutting Problem

An Iterated Local Search method for the constrained two-dimensional non-guillotine cutting problem is presented. This problem consists in cutting pieces from a large stock rectangle to maximize the total value of pieces cut. In this problem, we take into account restrictions on the number of pieces of each size required to be cut. It can be classified as 2D-SLOPP (two dimensional single large o...

متن کامل

Iterated local search for the multiple depot vehicle scheduling problem

The multiple depot vehicle scheduling problem (MDVSP) is a well-known and important problem arising in public transport. Although many solution approaches have been published in the literature, algorithms using metaheuristics appeared only very recently (Large Neighborhood Search and Tabu Search). In this paper, we introduce an Iterated Local Search algorithm for the MDVSP, incorporating a neig...

متن کامل

Iterated Local Search for the Generator Maintenance Scheduling Problem

We consider the task of devising an effective metaheuristic for a variant of the preventive maintenance scheduling problem (PMSP) — the (power) generator maintenance scheduling problem (GMSP). Recent research on metaheuristics for this problem has made progress on it, but the potential economic benefits of effective methods is significant in this area, and warrants further focused work. We prop...

متن کامل

An Improved Tabu Search Algorithm for Job Shop Scheduling Problem Trough Hybrid Solution Representations

Job shop scheduling problem (JSP) is an attractive field for researchers and production managers since it is a famous problem in many industries and a complex problem for researchers. Due to NP-hardness property of this problem, many meta-heuristics are developed to solve it. Solution representation (solution seed) is an important element for any meta-heuristic algorithm. Therefore, many resear...

متن کامل

An Iterated Greedy Algorithm for Solving the Blocking Flow Shop Scheduling Problem with Total Flow Time Criteria

In this paper, we propose an iterated greedy algorithm for solving the blocking flow shop scheduling problem with total flow time minimization objective. The steps of this algorithm are designed very efficient. For generating an initial solution, we develop an efficient constructive heuristic by modifying the best known NEH algorithm. Effectiveness of the proposed iterated greedy algorithm is t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematical Problems in Engineering

سال: 2013

ISSN: 1024-123X,1563-5147

DOI: 10.1155/2013/659297