An Investigation into whether Building Information Modelling (BIM) can Assist with Construction Delay Claims

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Investigation into whether Building Information Modelling (BIM) can Assist with Construction Delay Claims

It is probable that a construction project anywhere in the world will encounter some form of delay as a consequence of change. The impact of the delay on a project will vary, but it is likely to have a negative financial outcome. Compensation can be requested by an affected party in the form of a claim; however, issues of liability and quantum can be difficult given the ever increasing complexi...

متن کامل

The Challenges and Trends of Building Information Modelling (BIM) for Construction and Resources Sectors

Productivity is a comprehensive problem in many countries. Particularly in construction and resources sectors, low productivity will potentially discourage future investments as building assets is becoming more and more unaffordable and unsustainable. In recent years, Building Information Modelling (BIM) is becoming much more active than ever. In order to fully realize where BIM is believed to ...

متن کامل

Building Information Modelling ( Bim ) Implementation and Remote Construction Projects : Issues , Challenges , and Critiques

The construction industry has been facing a paradigm shift to (i) increase productivity, efficiency, infrastructure value; quality and sustainability (ii) reduce lifecycle costs, lead times and duplications via effective collaboration and communication of stakeholders in construction projects. This paradigm shift is becoming more critical with remote construction projects, which reveals unique ...

متن کامل

Building Information Modelling (BIM) in the Malaysian Architecture Industry

For the past quarter century, the architecture profession have seen tremendous developments in skills level, work processes and professional culture with the adoption of digital technologies. Investment in technology has always been to improve effectiveness in practice and increase performance in the design/build process that yields a return of investment at the end of the day. Today, more and ...

متن کامل

Building Information Modelling (BIM) and Project Management: a Stakeholders Perspective

Construction projects are becoming much more complex and difficult to manage. As a response Information and Communication Technology (ICT) has been developing at a very fast pace. The major shift in ICT for the Architecture Engineering and Construction (AEC) sector is the spreading of Building Information Modeling (BIM) (Bryde, Broquetas, & Volm, 2013). BIM is a system and its main objective is...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of 3-D Information Modeling

سال: 2013

ISSN: 2156-1710,2156-1702

DOI: 10.4018/ij3dim.2013010105