An integrated vendor–buyer model with stochastic demand, lot-size dependent lead-time and learning in production

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Integrated inventory model with lot size , production rate and lead time interactions ∗

Under the assumption that the replenishment lead time is dependent on both lot size of the buyer and production rate of the vendor, an integrated production inventory model is presented in this paper. The decision-making interaction of lead time between a buyer and a vendor in the integrated inventory model is analyzed. In terms of the model, a solution procedure has been developed to obtain th...

متن کامل

Integrated production-Inventory model with price-dependent demand, imperfect quality, and investment in quality and inspection

In practice, manufacturing systems are never perfect and may have low quality outputs. Therefore, different decisions such as reprocessing, sale at lower prices or diminishing are made according to industry and market. This paper investigates the importance of supply chain coordination through developing two models in centralized decision-making for an imperfect quality manufacturing system wit...

متن کامل

An Integrated Production-Inventory Model with Backorder and Lot for Lot Policy

    inventory model,   backorder   buyer ,   vendor,   lot for lot policy In this paper, an inventory model for two-stage supply chain is investigated. A supply chain with single vendor and single buyer is considered. We assume that shortage as a backorder is allowed for the buyer and the vendor makes the production set up every time the buyer places an order and supplies on a lot for lot basis...

متن کامل

An economic production model for deteriorating items and time dependent demand with rework and multiple production setups

Recently, much emphasis has given to study the control and maintenance of production inventories of the deteriorating items. Rework is one of the main issues in reverse logistic and green supply chain, since it can reduce production cost and the environmental problem. Many researchers have focused on developing rework model, but few of them have developed model for deteriorating items. Due to t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Industrial Engineering International

سال: 2019

ISSN: 1735-5702,2251-712X

DOI: 10.1007/s40092-019-00326-y