An integrated vendor-buyer model with equal shipments, normally distributed demand and empirically distributed lead-time

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An integrated vendor–buyer model with stochastic demand, lot-size dependent lead-time and learning in production

In this article, an imperfect vendor–buyer inventory system with stochastic demand, process quality control and learning in production is investigated. It is assumed that there are learning in production and investment for process quality improvement at the vendor’s end, and lot-size dependent lead-time at the buyer’s end. The lead-time for the first batch and those for the rest of the batches ...

متن کامل

Integrated single vendor single buyer model with stochastic demand and variable lead time

In this paper, we consider the single vendor single buyer integrated production inventory problem. We relax the assumption of deterministic demand and assume that the lead time is varying lineraly with the lot size. The lead time is composed of a lot size-dependent run time and constant delay times such as moving, waiting and setup times. A solution procedure is suggested for solving the propos...

متن کامل

A single-vendor and a single-buyer integrated inventory model with ordering cost reduction dependent on lead time

Lead time is one of the major limits that affect planning at every stage of the supply chain system. In this paper, we study a continuous review inventory model. This paper investigates the ordering cost reductions are dependent on lead time. This study addressed two-echelon supply chain problem consisting of a single vendor and a single buyer. The main contribution of this study is that the in...

متن کامل

An Integrated Vendor-Buyer Model with Uncertain Lead Time, Life Time under Inflation and Variable Holding Cost

This study considers the problem of a vendor which supplies an item to the buyer with imprecise partial backlogging rate of unsatisfied demand and non instantaneous deterioration rate considering variable holding cost, the effect of inflation and time value of money. The supplier’s lead time is a stochastic function of his managing cost. The extra costs incurred by the retailer due to the uncer...

متن کامل

Joint single vendor-single buyer supply chain problem with stochastic demand and fuzzy lead-time

In this paper, a chance-constraint joint single vendor, single buyer supply chain problem with stochastic demand and fuzzy lead-time is investigated. The lead-time is lot size dependent; and delay times such as moving, waiting and setting time are fuzzy. The shortage costs result from backorder and/or lost sale, and the uncertain demand follows a uniform distribution. The buyer’s cost function ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Operational Research

سال: 2019

ISSN: 1745-7645,1745-7653

DOI: 10.1504/ijor.2019.10022811