In the construction management planning, both client and contractor are interested in completing project within planned schedule. To achieve it, time-cost trade-off problem (TCTP) is carried-out to obtain optimal set of alternatives. Although Pareto front solutions not preferred each other, decision-maker (DM) has choose only best solution. The DMs neither well-educated nor have adequate knowledge make proper decisions. Thus, such a choice be made through additional preferences included original formulation optimization problem. better support meta-heuristic outputs, this paper, an integration entropy weight, simple additive weighting (SAW), technique for order preference by similarity ideal solution (TOPSIS) modelled solve MCDM problem, while Teaching Learning Based Optimization (TLBO) algorithm applied proposed multi-objective decision-making model. model, weights selections done objectively demonstrate variation on rankings approaches. While served determine weight criteria from matrix data TOPSIS method employed rank alternative solutions. methodology utilized well-known problems. obtained results compared against provided (SAW) approach investigate efficiency Results that present model can favorable decision-makers.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project

This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...

متن کامل

Multi-Objective Time-Cost Trade-Off Analysis in Critical Chain Project Networks Using Pareto Simulated Annealing

This paper presents a new multi-objective Time-Cost Trade-Off (TCTO) model for Critical Chain Project Management (CCPM) networks. The presented model helps crashing a project with little, or no, additional cost. As combinatorial optimization problems' finding optimal decisions are difficult and is time consuming; considering the number of possible permutations involved for TCTO optimization, th...

متن کامل

A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm

In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...

متن کامل

a multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project

this paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. the net present value (npv) maximization and making span minimization are this study objectives. and since this problem is considered as complex optimization in np-hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...

متن کامل

A novel multi criteria decision making model for optimizing time-cost-quality trade-off problems in construction projects

The planning phase of every construction project is entangled with multiple and occasionally conflicting criteria which need to be optimized simultaneously. Multi-criterion decision-making (MCDM) approaches can aid decision-makers in selecting the most appropriate solution among numerous potential Pareto optimal solutions. An evidential reasoning (ER) approach was applied for the first time in ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Management and Fuzzy Systems

سال: 2021

ISSN: ['2575-4947', '2575-4939']

DOI: https://doi.org/10.11648/j.ijmfs.20210702.12