An integrated model for the transshipment yard scheduling problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

New bounds and algorithms for the transshipment yard scheduling problem

In a modern rail–rail transshipment yard huge gantry cranes transship containers between different freight trains, so that hub-and-spoke railway systems are enabled. In this context, we consider the transshipment yard scheduling problem (TYSP) where trains have to be assigned to bundles, which jointly enter and leave the yard. The objective is to minimize split moves and revisits. Split moves a...

متن کامل

An Energy-efficient Mathematical Model for the Resource-constrained Project Scheduling Problem: An Evolutionary Algorithm

In this paper, we propose an energy-efficient mathematical model for the resource-constrained project scheduling problem to optimize makespan and consumption of energy, simultaneously. In the proposed model, resources are speed-scaling machines. The problem is NP-hard in the strong sense. Therefore, a multi-objective fruit fly optimization algorithm (MOFOA) is developed. The MOFOA uses the VIKO...

متن کامل

Optimizing yard assignment in an automotive transshipment terminal

We present an optimization model for the yard allocation process in an automotive transshipment terminal. The cars arrive and depart by ships in large batches and the yard planners have to dynamically assign incoming cars to parking rows. The integer linear programming model has been implemented in a commercial solver (CPLEX). We will present at the conference the model, the CPLEX computational...

متن کامل

A Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint

In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, thi...

متن کامل

A New model for integrated lot sizing and scheduling in flexible job shop problem

In this paper an integrated lot-sizing and scheduling problem in a flexible job shop environment with machine-capacity-constraint is studied. The main objective is to minimize the total cost which includes the inventory costs, production costs and the costs of machine’s idle times. First, a new mixed integer programming model,with small bucket time approach,based onProportional Lot sizing and S...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Scheduling

سال: 2016

ISSN: 1094-6136,1099-1425

DOI: 10.1007/s10951-016-0470-4