Multicriteria Optimisation of Railway Track for High-speed Lines
The paper presents results of multicriteria optimum design of an embedded rail structure (ERS). The optimality criteria are based on the requirements to railway tracks related to cost efficiency of the design, minimum noise emission and minimum wear of wheels and rails. The design variables comprise the material and geometry properties of ERS, namely elastic properties and volume of compound, s...
متن کاملDynamic Analysis of Railway track
In the present analysis, an infinite Euler– Bernoulli beam of constant cross-section resting on an elastic foundation is considered. The beam and foundation are assumed to be homogeneous and isotropic. The foundation is modeled using one parameter without damping. The beam is subjected to a constant point load moving with a constant speed along the beam. An effort has been made to find the solu...
متن کاملRailway Track Stiffness - Dynamic Measurements and Evaluation for Efficient Maintenance
v Outline of Thesis vii Author contribution of papers ix Contribution of Thesis xi
متن کاملEvaluation of High-Speed Railway Bridges Based on a Nondestructive Monitoring System
Recently, trains’ velocities in Korea increased more than the speed used in the design of some bridges. Accordingly, this paper demonstrates the evaluation of a railway bridge due to high-speed trains’ movement. A nondestructive monitoring system is used to assess the bridge performance under train speeds of 290, 360, 400 and 406 km/h. This system is comprised of a wireless short-term accelerat...
متن کاملA Reliability Evaluation of High Speed Railway Traction Substation Based on the GO-FLOW Methodology
In order to assure the uninterrupted power supply of high speed railway, the reliability assessment of traction substation is essential at the design stage. Based on the system reliability engineering theory, a new system reliability analysis method called the GO-FLOW methodology is applied in the reliability assessment of traction substation of high speed railway. Considering failure and dynam...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Applied Sciences
سال: 2020
ISSN: 2076-3417
DOI: 10.3390/app10165546