An improved peak frequency shift method for Q estimation based on generalized seismic wavelet function
نویسندگان
چکیده
منابع مشابه
An improved peak-frequency-shift method for Q estimation
There are mainly two frequency-shift methods developed for Q estimation: the centroid-frequency-shift method and the peak-frequency-shift method. Both of the two methods have advantages and disadvantages. Here we discuss and compare the two methods in detail and propose a novel frequency-shift method for Q estimation, which can improve Q estimates by combining the benefits of the two methods to...
متن کاملQ estimation from reflection seismic data for hydrocarbon detection using a modified frequency shift method
As a powerfully diagnostic tool for structural interpretation, reservoir characterization, and hydrocarbon detection, quality factor Q provides useful information in seismic processing and interpretation. Popular methods, like the spectral ratio (SR) method, central frequency shift (CFS) method and peak frequency shift (PFS) method, have their respective limitations in dealing with field seismi...
متن کاملAn Denoising Method based on Improved Wavelet Threshold Function
The ECG signal is an important parameter for the diagnosis of heart disease. In the process of collection and transportation, ECG signals easily mixed with human body noise or the noise generated by the instrument. Therefore, the noise greatly affects the accuracy of the measurement. Wavelet threshold denoising method is widely used in denoising of ECG signal. Based on soft threshold and hard t...
متن کاملAn Improved Algorithmic Method for Software Development Effort Estimation
Accurate estimating is one of the most important activities in the field of software project management. Different aspects of software projects must be estimated among which time and effort are of significant importance to efficient project planning. Due to complexity of software projects and lack of information at the early stages of project, reliable effort estimation is a challenging issue. ...
متن کاملAn Improved Algorithmic Method for Software Development Effort Estimation
Accurate estimating is one of the most important activities in the field of software project management. Different aspects of software projects must be estimated among which time and effort are of significant importance to efficient project planning. Due to complexity of software projects and lack of information at the early stages of project, reliable effort estimation is a challenging issue. ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Geophysics and Engineering
سال: 2018
ISSN: 1742-2132,1742-2140
DOI: 10.1088/1742-2140/aa8714