An improved basis for enzymatic estimation of infarct size.
نویسندگان
چکیده
منابع مشابه
An improved basis for enzymatic estimation of infarct size.
Infarct size has been estimated from serial serum creatine phosphokinase (CPK) changes, but the contribution of noncardiac CPK may interfere. Results would also be influenced if CPK disappearance varied with hemodynamic changes. Since MB CPK is a marker more specific to myocardium. infarct size was estimated from serum MB changes in 16 patients. In addition, 21 chronically instrumented consciou...
متن کاملLimitation of enzymatic models for predicting myocardial infarct size.
The possibility of predicting myocardial infarct size from early enzyme measurements was studied using a physiological two compartment distribution model. Based on this the time dependent appearance function in plasma was calculated for creatine kinase, aspartate aminotransferase, and lactate dehydrogenase in 29 patients suffering from acute myocardial infarction. On average, the appearance fun...
متن کاملEnzymatic estimation of infarct size. Thrombolysis induced its demise: will it now rekindle its renaissance?
I nfarct size was central to the major thrust of cardiac research in the 1970s and as such occupied center stage as the culprit to be conquered by interventions designed to cardioprotect and limit myocardial damage (infarct size). Myocardial infarction, with its consequent necrosis, was the leading cause of death and came under intense attack with infarct size posing as the surrogate villain. I...
متن کاملCorrelation between enzymatic estimation of infarct size and early mortality rate.
In 585 patients with a first acute myocardial infarction the maximum activity of heat stable lactate dehydrogenase (EC 1.1.1.27) was correlated with mortality at three months. The patients participated in a double blind trial with metoprolol in acute myocardial infarction. In all patients not taking a beta blocker a highly significant correlation was found, but this was not evident in those who...
متن کاملAn Improved Algorithmic Method for Software Development Effort Estimation
Accurate estimating is one of the most important activities in the field of software project management. Different aspects of software projects must be estimated among which time and effort are of significant importance to efficient project planning. Due to complexity of software projects and lack of information at the early stages of project, reliable effort estimation is a challenging issue. ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Circulation
سال: 1975
ISSN: 0009-7322,1524-4539
DOI: 10.1161/01.cir.52.5.743