An Experimental Study for Construction of Emergency Spillway in Daechung Dam

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

development and implementation of an optimized control strategy for induction machine in an electric vehicle

in the area of automotive engineering there is a tendency to more electrification of power train. in this work control of an induction machine for the application of electric vehicle is investigated. through the changing operating point of the machine, adapting the rotor magnetization current seems to be useful to increase the machines efficiency. in the literature there are many approaches wh...

15 صفحه اول

study of cohesive devices in the textbook of english for the students of apsychology by rastegarpour

this study investigates the cohesive devices used in the textbook of english for the students of psychology. the research questions and hypotheses in the present study are based on what frequency and distribution of grammatical and lexical cohesive devices are. then, to answer the questions all grammatical and lexical cohesive devices in reading comprehension passages from 6 units of 21units th...

Feasibility study and construction of an underground dam in the Daryan watershed (Case Study Mashnaq Underground Dam)

    The water crisis in arid and semi-arid regions is a limiting factor for human activities and sustainable agricultural development. One of the new solutions in this field is the construction of underground dams. Underground dams compared to conventional dams that store river water in open reservoirs; block the subsurface flow of water in the cross-section of the river and store it under the ...

متن کامل

Reduce the maximum scour depth downstream of Flip Bucket Spillway through the spillway geometry optimization (study released spillway dam Kurdistan)

The Performance of shooting pool, in addition to the quality of the area in which the flow collides with it, depends to the height of the jet drop, the angle of the water flow, the depth of the jet and the concentration of the jet. By increasing the height of the jet drop, the fall velocity increases and subsequently the jetchr('39')s energy will be more intrusive. Different collision area from...

متن کامل

Internal erosion under spillway rested on an embankment dam

In this paper we investigate the mechanism of internal erosion caused in the right abutment of the Shahghasem dam’s spillway. Shahghasem dam is an earthen dam located in Yasouj, in southwest of Iran. A significant hole and pipe have been observed in the corner of the right abutment from upstream view. The foundation is Marlstone, which has low cohesion and susceptible for internal erosion and p...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Engineering

سال: 2012

ISSN: 1947-3931,1947-394X

DOI: 10.4236/eng.2012.49072