An exact approach to minimizing total weighted tardiness with release dates

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An exact approach to minimizing total weighted tardiness with release dates

The study deals with scheduling a set of independent jobs with unequal release dates to minimize total weighted tardiness on a single machine. We propose new dominance properties that are incorporated in a branch and bound algorithm. The proposed algorithm is tested on a set of randomly generated problems with 10, 15 and 20 jobs. To the best of our knowledge, this is the first exact approach th...

متن کامل

Single .machine Total Weighted Tardiness with Release Dates Single Machine Total Weighted Tardiness with Release Dates

The single machine total weighted tardiness with release dates problem is known to be strongly NP-hard. With a new lower bounding scheme and a new upper bounding scheme, we get an efficient branch and bound algorithm. In the paper, we first introduce the history of the problem and its computational complexity. Second, the lower bounding schemes and the upper bounding schemes are described in de...

متن کامل

Minimizing Total Tardiness in Parallel-Machine Scheduling with Release Dates

The considered problem is the scheduling of a set of N jobs on M identical parallel machines in order to minimize the total tardiness without any preemption or splitting. Each job has its own processing time, release date and due date. All the machines are considered identical (with same speed) and available during all the scheduling period. This problem is NP-hard. An exact resolution, an Ant ...

متن کامل

Minimizing Total Weighted Tardiness with Drop Dead Dates in Single Machine Scheduling Problem

  This paper deals with minimization of tardiness in single machine scheduling problem when each job has two different due-dates i.e. ordinary due-date and drop dead date. The drop dead date is the date in which jobs’ weights rise sharply or the customer cancels the order. A linear programming formulation is developed for the problem and since the problem is known to be NP-hard, three heuristic...

متن کامل

Minimizing total weighted tardiness on a single machine with release dates and equal-length jobs

In this paper we look at the problem where we have to schedule n jobs with release dates, due dates, weights, and equal processing times on a single machine. The objective is to minimize the sum of weighted tardiness (1|rj , pj = p| ∑ wjTj in the threefield notation scheme). We formulate the problem as a time indexed ILP after which we solve the LP-relaxation. We show that for certain special c...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IIE Transactions

سال: 2000

ISSN: 0740-817X,1545-8830

DOI: 10.1080/07408170008967464