An exact algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times
نویسندگان
چکیده
منابع مشابه
An improved scatter search algorithm for the single machine total weighted tardiness scheduling problem with sequence-dependent setup times
In this paper, a scatter search algorithm with improved component modules is proposed to solve the single machine total weighted tardiness problem with sequence-dependent setup times. For diversification generation module, both random strategy based heuristics and construction heuristic are adopted to generate the diversified population. For improvement module, variable neighborhood search base...
متن کاملAn Iterated Greedy Algorithm for Flexible Flow Lines with Sequence Dependent Setup Times to Minimize Total Weighted Completion Time
This paper explores the flexile flow lines where setup times are sequence- dependent. The optimization criterion is the minimization of total weighted completion time. We propose an iterated greedy algorithm (IGA) to tackle the problem. An experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of IGA are compared against those of some other exist...
متن کاملMinimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times
We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is designed in order to minimize the total tardiness and the makespan. Among several mult...
متن کاملEfficient local search limitation strategy for single machine total weighted tardiness scheduling with sequence-dependent setup times
This paper concerns the single machine total weighted tardiness scheduling with sequence-dependent setup times, usually referred as 1|sij | ∑ wjTj . In this NP-hard problem, each job has an associated processing time, due date and a weight. For each pair of jobs i and j, there may be a setup time before starting to process j in case this job is scheduled immediately after i. The objective is to...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Computers & Operations Research
سال: 2013
ISSN: 0305-0548
DOI: 10.1016/j.cor.2012.07.004