An evaluation of heuristics for scheduling a non-delay permutation flow shop with family setups to minimize total earliness and tardiness
نویسندگان
چکیده
منابع مشابه
Single machine scheduling with family setups to minimize total earliness and tardiness
This paper considers the problem of scheduling a given number of jobs on a single machine to minimize total earliness and tardiness when family setup times exist. The paper proposes optimal branch-and-bound algorithms for both the group technology assumption and if the group technology assumption is removed. A heuristic algorithm is proposed to solve larger problems with the group technology as...
متن کاملSingle Machine Group Scheduling with Setups to Minimize Total Tardiness
This paper considers the single machine scheduling problem with independent family (group) setup times where jobs in each family are processed together. A sequence independent setup is required to process a job from a different family. The objective is to minimize total tardiness. A mixed integer programming model capable of solving small sized problems is described. Several heuristic algorithm...
متن کاملElectromagnetism-like algorithm for fuzzy flow shop batch processing machines scheduling to minimize total weighted earliness and tardiness
In this paper, we study a flow shop batch processing machines scheduling problem. The fuzzy due dates are considered to make the problem more close to the reality. The objective function is taken as the weighted sum of fuzzy earliness and fuzzy tardiness. In order to tackle the given problem, we propose a hybrid electromagnetism-like (EM) algorithm, in which the EM is hybridized with a diversi...
متن کاملElectromagnetism-like algorithm for fuzzy flow shop batch processing machines scheduling to minimize total weighted earliness and tardiness
In this paper, we study a flow shop batch processing machines scheduling problem. The fuzzy due dates are considered to make the problem more close to the reality. The objective function is taken as the weighted sum of fuzzy earliness and fuzzy tardiness. In order to tackle the given problem, we propose a hybrid electromagnetism-like (EM) algorithm, in which the EM is hybridized with a diversif...
متن کاملBounds for the permutation flowshop scheduling problem with exact time lags to minimize the total earliness and tardiness
We consider the problem of n-jobs scheduling in an m-machine permutation flowshop with exact time lags between consecutive operations of each job. The exact time lag is defined as the time elapsed between every couple of successive operations of the same job which is equal to a prescribed value. The aim is to find a feasible schedule that minimizes the total tardiness and earliness. We propose ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of the Operational Research Society
سال: 2013
ISSN: 0160-5682,1476-9360
DOI: 10.1057/jors.2012.94